Skip to content

ddl: cancel create view job , when failed to drop old view (#40353)#53952

Closed
ti-chi-bot wants to merge 2 commits intopingcap:release-6.1from
ti-chi-bot:cherry-pick-40353-to-release-6.1
Closed

ddl: cancel create view job , when failed to drop old view (#40353)#53952
ti-chi-bot wants to merge 2 commits intopingcap:release-6.1from
ti-chi-bot:cherry-pick-40353-to-release-6.1

Conversation

@ti-chi-bot
Copy link
Member

This is an automated cherry-pick of #40353

Signed-off-by: zeminzhou zhouzemin@pingcap.com

What problem does this PR solve?

Issue Number: close #40352

Problem Summary:

What is changed and how it works?

cancel create view job , when failed to drop old view

Check List

Tests

  • Unit test
  • Integration test
  • Manual test (add detailed scripts or steps below)
  • No code

Side effects

No

Documentation

No

Release note

cancel `create view` job , when failed to drop old view

Signed-off-by: zeminzhou <zhouzemin@pingcap.com>
Signed-off-by: zeminzhou <zhouzemin@pingcap.com>
@ti-chi-bot ti-chi-bot added release-note Denotes a PR that will be considered when it comes time to generate release notes. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-6.1 This PR is cherry-picked to release-6.1 from a source PR. labels Jun 12, 2024
@ti-chi-bot ti-chi-bot bot added approved needs-1-more-lgtm Indicates a PR needs 1 more LGTM. labels Jun 12, 2024
@ti-chi-bot ti-chi-bot added the cherry-pick-approved Cherry pick PR approved by release team. label Jun 12, 2024
@ti-chi-bot
Copy link

ti-chi-bot bot commented Jun 12, 2024

@ti-chi-bot: The following tests failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
idc-jenkins-ci-tidb/unit-test a0a40f6 link true /test unit-test
idc-jenkins-ci-tidb/check_dev a0a40f6 link true /test check-dev

Full PR test history. Your PR dashboard.

Details

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes/test-infra repository. I understand the commands that are listed here.

@ti-chi-bot ti-chi-bot bot added the lgtm label Jun 12, 2024
@ti-chi-bot
Copy link

ti-chi-bot bot commented Jun 12, 2024

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: tangenta, wjhuang2016

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Details Needs approval from an approver in each of these files:
  • OWNERS [tangenta,wjhuang2016]

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@ti-chi-bot ti-chi-bot bot removed the needs-1-more-lgtm Indicates a PR needs 1 more LGTM. label Jun 12, 2024
@ti-chi-bot
Copy link

ti-chi-bot bot commented Jun 12, 2024

[LGTM Timeline notifier]

Timeline:

  • 2024-06-12 03:21:47.278230006 +0000 UTC m=+521261.331541930: ☑️ agreed by tangenta.
  • 2024-06-12 06:58:28.108689462 +0000 UTC m=+534262.162001383: ☑️ agreed by wjhuang2016.

@ti-chi-bot ti-chi-bot bot added do-not-merge/cherry-pick-not-approved and removed cherry-pick-approved Cherry pick PR approved by release team. labels Mar 4, 2025
@ti-chi-bot ti-chi-bot closed this Apr 29, 2025
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved do-not-merge/cherry-pick-not-approved lgtm release-note Denotes a PR that will be considered when it comes time to generate release notes. size/M Denotes a PR that changes 30-99 lines, ignoring generated files. type/cherry-pick-for-release-6.1 This PR is cherry-picked to release-6.1 from a source PR.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants