planner: rebuild range when the range is empty (#30003)#30146
planner: rebuild range when the range is empty (#30003)#30146ti-chi-bot merged 13 commits intopingcap:release-5.3from
Conversation
Signed-off-by: ti-srebot <ti-srebot@pingcap.com>
|
[REVIEW NOTIFICATION] This pull request has been approved by:
To complete the pull request process, please ask the reviewers in the list to review by filling The full list of commands accepted by this bot can be found here. DetailsReviewer can indicate their review by submitting an approval review. |
|
/run-all-tests |
|
@Reminiscent you're already a collaborator in bot's repo. |
|
/run-check_dev |
…release-5.3-78c653e294e7
|
/run-check_dev |
|
/run-mysql-test |
|
/merge |
|
This pull request has been accepted and is ready to merge. DetailsCommit hash: 48fbefe |
|
/run-check_dev |
2 similar comments
|
/run-check_dev |
|
/run-check_dev |
|
/run-check_dev |
|
/run-check_dev |
|
/run-check_dev |
1 similar comment
|
/run-check_dev |
|
@ti-srebot: Your PR was out of date, I have automatically updated it for you. At the same time I will also trigger all tests for you: /run-all-tests If the CI test fails, you just re-trigger the test that failed and the bot will merge the PR for you after the CI passes. DetailsInstructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the ti-community-infra/tichi repository. |
cherry-pick #30003 to release-5.3
You can switch your code base to this Pull Request by using git-extras:
# In tidb repo: git pr https://github.com/pingcap/tidb/pull/30146After apply modifications, you can push your change to this PR via:
What problem does this PR solve?
Issue Number: close #29993
close #30100
Problem Summary:
tableDualplan.What is changed and how it works?
tableDualand uncache the plan.Check List
Tests
Side effects
Documentation
Release note