Release OpenSearch and OpenSearch Dashboards 1.3.14
I noticed that a manifest was automatically created in manifests/1.3.14. Please follow the following checklist to make a release.
How to use this issue
This Release Issue
This issue captures the state of the OpenSearch release, its assignee (Release Manager) is responsible for driving the release. Please contact them or @mention them on this issue for help. There are linked issues on components of the release where individual components can be tracked. For more information check the the Release Process OpenSearch Guide.
Please refer to the following link for the release version dates: Release Schedule and Maintenance Policy.
Release - _Ends Dec 12th
Release Checklist
Pre-Release activities
Release activities
Post-Release activities
Components
Replace with links to all component tracking issues.
| Component |
On track |
Release Notes |
| {COMPONENT_ISSUE_LINK} |
{INDICATOR}} |
{STATUS} |
Legend
| Symbol |
Meaning |
| 🟢 |
On track with overall release |
| 🟡 |
Missed last milestone |
| 🔴 |
Missed multiple milestones |
Release OpenSearch and OpenSearch Dashboards 1.3.14
I noticed that a manifest was automatically created in manifests/1.3.14. Please follow the following checklist to make a release.
How to use this issue
This Release Issue
This issue captures the state of the OpenSearch release, its assignee (Release Manager) is responsible for driving the release. Please contact them or @mention them on this issue for help. There are linked issues on components of the release where individual components can be tracked. For more information check the the Release Process OpenSearch Guide.
Please refer to the following link for the release version dates: Release Schedule and Maintenance Policy.
Preparation
Release Branch and Version Increment - _Ends Dec 1st
Feature Freeze - _Ends Dec 5th
Code Complete - _Ends Dec 5th
Release Candidate Creation and Testing - _Ends Dec 6th
Generate Release Candidate.
Integ Test TAR.
Integ Test RPM.
Docker Build and Scan.
Backwards Compatibility Tests.
Windows Integration Test.
Broadcast and Communication.
Release Candidate Lock.
Post the benchmark-tests
Longevity tests do not show any issues.
Pre Release - _Ends Dec 11th
Release - _Ends Dec 12th
Release Checklist.
Release Checklist
Pre-Release activities
Release activities
Completed validation for <>in the logs).Post-Release activities
Post Release
Components
Replace with links to all component tracking issues.
Legend