Skip to content

Proper EC point validation #93

@malishav

Description

@malishav

A PR on draft-ietf-lake-traces adds several invalid test vectors. Some of these contain messages with invalid G_X. In edhoc-rs, the point is not properly validated before the ECDH operation. This issue aims at adding point validation in process_message_1 and process_message_2 routines, which if failed, should return an error.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions