Skip to content

docs(plan): mark S1.2/S1.3/S1.4 complete#38

Merged
GilboaAWS merged 1 commit into
unstablefrom
gilboa/plan-s1-complete
Jun 22, 2026
Merged

docs(plan): mark S1.2/S1.3/S1.4 complete#38
GilboaAWS merged 1 commit into
unstablefrom
gilboa/plan-s1-complete

Conversation

@GilboaAWS

Copy link
Copy Markdown
Collaborator

Marks S1 subsystem tasks as done in the implementation plan:

Drift-retrain trigger (S1.5) deferred to Phase 2 — blocked on live ratio metric from S2.5+ workers.

Doc-only, no code changes.

S1.2 (training sampler), S1.3 (bio train job), and S1.4 (train
completion + promotion) all landed in PR #20; follow-up NULL-guard
fix in PR #25. Drift-retrain trigger wiring deferred to S1.5
(Phase 2), blocked on the live-ratio metric from S2.5+ workers.

Rebased onto current unstable so the diff is limited to the three
S1.x checkboxes — preserves the S4.1 in-progress marker and the
2026-06-18 sequencing-override note added by later PRs.
@GilboaAWS GilboaAWS force-pushed the gilboa/plan-s1-complete branch from 919f03f to a3ea10b Compare June 22, 2026 11:05
@GilboaAWS GilboaAWS merged commit 3ac09c0 into unstable Jun 22, 2026
24 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant