Skip to content

Fix #3397 Improve timeline's buttons (Failing test)#3408

Merged
offtherailz merged 1 commit intogeosolutions-it:c127_geonode_integrationfrom
allyoucanmap:test-timeline
Dec 12, 2018
Merged

Fix #3397 Improve timeline's buttons (Failing test)#3408
offtherailz merged 1 commit intogeosolutions-it:c127_geonode_integrationfrom
allyoucanmap:test-timeline

Conversation

@allyoucanmap
Copy link
Copy Markdown
Contributor

Description

Test was failing after merging in c127_geonode_integration branch.

Issues

Please check if the PR fulfills these requirements

What kind of change does this PR introduce? (check one with "x", remove the others)

  • Failing test

What is the current behavior? (You can also link to an open issue here)

What is the new behavior?

Does this PR introduce a breaking change? (check one with "x", remove the other)

  • No

If this PR contains a breaking change, please describe the impact and migration path for existing applications: ...

Other information:

@coveralls
Copy link
Copy Markdown

Coverage Status

Coverage increased (+0.03%) to 80.729% when pulling de521ea on allyoucanmap:test-timeline into b5a6fa0 on geosolutions-it:c127_geonode_integration.

@offtherailz offtherailz merged commit f5b4c5a into geosolutions-it:c127_geonode_integration Dec 12, 2018
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants