Skip to content

[7.9] remove visual aspects of baseline job (#77815)#77843

Merged
spalger merged 1 commit intoelastic:7.9from
spalger:backport/7.9/pr-77815
Sep 18, 2020
Merged

[7.9] remove visual aspects of baseline job (#77815)#77843
spalger merged 1 commit intoelastic:7.9from
spalger:backport/7.9/pr-77815

Conversation

@spalger
Copy link
Copy Markdown
Contributor

@spalger spalger commented Sep 18, 2020

Backports the following commits to 7.9:

Co-authored-by: spalger <spalger@users.noreply.github.com>
Co-authored-by: Elastic Machine <elasticmachine@users.noreply.github.com>
@spalger spalger added the backport This PR is a backport of another PR label Sep 18, 2020
@kibanamachine
Copy link
Copy Markdown
Contributor

💚 Build Succeeded

Build metrics

✅ unchanged

To update your PR or re-run it, just comment with:
@elasticmachine merge upstream

@spalger spalger merged commit 44b0846 into elastic:7.9 Sep 18, 2020
@spalger spalger deleted the backport/7.9/pr-77815 branch September 18, 2020 04:21
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport This PR is a backport of another PR

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants