Skip to content

[8.19] chore: clean cache before moving on with other jobs (#259930)#259964

Merged
kibanamachine merged 1 commit intoelastic:8.19from
kibanamachine:backport/8.19/pr-259930
Mar 27, 2026
Merged

[8.19] chore: clean cache before moving on with other jobs (#259930)#259964
kibanamachine merged 1 commit intoelastic:8.19from
kibanamachine:backport/8.19/pr-259930

Conversation

@kibanamachine
Copy link
Copy Markdown
Contributor

Backport

This will backport the following commits from main to 8.19:

Questions ?

Please refer to the Backport tool documentation

@kibanamachine kibanamachine added the backport This PR is a backport of another PR label Mar 27, 2026
@kibanamachine kibanamachine enabled auto-merge (squash) March 27, 2026 11:58
@kibanamachine kibanamachine merged commit 2c819db into elastic:8.19 Mar 27, 2026
19 checks passed
@elasticmachine
Copy link
Copy Markdown
Contributor

💛 Build succeeded, but was flaky

Failed CI Steps

Metrics [docs]

✅ unchanged

cc @TamerlanG

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport This PR is a backport of another PR

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants