Skip to content

[9.2] Upgraded flatted (#258252)#258375

Merged
kibanamachine merged 1 commit intoelastic:9.2from
kibanamachine:backport/9.2/pr-258252
Mar 18, 2026
Merged

[9.2] Upgraded flatted (#258252)#258375
kibanamachine merged 1 commit intoelastic:9.2from
kibanamachine:backport/9.2/pr-258252

Conversation

@kibanamachine
Copy link
Copy Markdown
Contributor

Backport

This will backport the following commits from main to 9.2:

Questions ?

Please refer to the Backport tool documentation

## Summary

bumped flatted

(cherry picked from commit 177f8df)
@kibanamachine kibanamachine added the backport This PR is a backport of another PR label Mar 18, 2026
@kibanamachine kibanamachine enabled auto-merge (squash) March 18, 2026 14:37
@kibanamachine kibanamachine merged commit 717de3b into elastic:9.2 Mar 18, 2026
19 checks passed
@elasticmachine
Copy link
Copy Markdown
Contributor

💛 Build succeeded, but was flaky

Failed CI Steps

Test Failures

  • [job] [logs] FTR Configs #8 / Core Analysis - Entity Store @ess Host transform logic Install Entity Store and test Host transform Should successfully trigger a host transform

Metrics [docs]

✅ unchanged

cc @rgodfrey-elastic

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport This PR is a backport of another PR

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants