Skip to content

[7.x] [Lens] Fix wrong error detection on transition to Top values operation (#102384)#102611

Merged
kibanamachine merged 1 commit intoelastic:7.xfrom
kibanamachine:backport/7.x/pr-102384
Jun 18, 2021
Merged

[7.x] [Lens] Fix wrong error detection on transition to Top values operation (#102384)#102611
kibanamachine merged 1 commit intoelastic:7.xfrom
kibanamachine:backport/7.x/pr-102384

Conversation

@kibanamachine
Copy link
Copy Markdown
Contributor

Backports the following commits to 7.x:

@kibanamachine kibanamachine added the backport This PR is a backport of another PR label Jun 18, 2021
@kibanamachine kibanamachine enabled auto-merge (squash) June 18, 2021 08:48
@kibanamachine
Copy link
Copy Markdown
Contributor Author

💚 Build Succeeded

Metrics [docs]

Async chunks

Total size of all lazy-loaded chunks that will be downloaded as the user navigates the app

id before after diff
lens 1.5MB 1.5MB +175.0B

To update your PR or re-run it, just comment with:
@elasticmachine merge upstream

cc @dej611

@kibanamachine kibanamachine merged commit 0e04be0 into elastic:7.x Jun 18, 2021
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport This PR is a backport of another PR

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants