Skip to content

Re-adding pipeline changes removed by mistake#1353

Merged
narph merged 3 commits intoelastic:masterfrom
narph:revert-sync
Jul 26, 2021
Merged

Re-adding pipeline changes removed by mistake#1353
narph merged 3 commits intoelastic:masterfrom
narph:revert-sync

Conversation

@narph
Copy link
Copy Markdown
Contributor

@narph narph commented Jul 26, 2021

What does this PR do?

  • add pipeline changes removed during module integration sync

Checklist

  • I have reviewed tips for building integrations and this pull request is aligned with them.
  • I have verified that all data streams collect metrics or logs.
  • I have added an entry to my package's changelog.yml file.
  • If I'm introducing a new feature, I have modified the Kibana version constraint in my package's manifest.yml file to point to the latest Elastic stack release (e.g. ^7.13.0).

@narph narph self-assigned this Jul 26, 2021
@narph narph added the Integration:azure Azure Logs label Jul 26, 2021
@elasticmachine
Copy link
Copy Markdown

elasticmachine commented Jul 26, 2021

💚 Build Succeeded

the below badges are clickable and redirect to their specific view in the CI or DOCS
Pipeline View Test View Changes Artifacts preview preview

Expand to view the summary

Build stats

  • Start Time: 2021-07-26T12:20:06.490+0000

  • Duration: 12 min 51 sec

  • Commit: b5d513b

Test stats 🧪

Test Results
Failed 0
Passed 45
Skipped 0
Total 45

Trends 🧪

Image of Build Times

Image of Tests

Copy link
Copy Markdown
Contributor

@mtojek mtojek left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

Ship it!

@narph narph merged commit 6bf55e4 into elastic:master Jul 26, 2021
@narph narph deleted the revert-sync branch July 26, 2021 13:41
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants