Skip to content

[7.x] Re-enable BWC tests after backport of ILM frozen phase changes (#70179)#70188

Merged
dakrone merged 1 commit intoelastic:7.xfrom
dakrone:backport/7.x/pr-70179
Mar 10, 2021
Merged

[7.x] Re-enable BWC tests after backport of ILM frozen phase changes (#70179)#70188
dakrone merged 1 commit intoelastic:7.xfrom
dakrone:backport/7.x/pr-70179

Conversation

@dakrone
Copy link
Copy Markdown
Member

@dakrone dakrone commented Mar 9, 2021

Backports the following commits to 7.x:

…ic#70179)

With elastic#70158 (master), elastic#70170 (7.x), and elastic#70171 (7.12) merged, we can now re-enable backwards
compatibilty tests on master and 7.x.
@dakrone dakrone added backport :Data Management/ILM+SLM DO NOT USE. Use ":StorageEngine/ILM" or ":Distributed Coordination/SLM" instead. >non-issue v7.13.0 labels Mar 9, 2021
@elasticmachine elasticmachine added the Team:Data Management (obsolete) DO NOT USE. This team no longer exists. label Mar 9, 2021
@elasticmachine
Copy link
Copy Markdown
Collaborator

Pinging @elastic/es-core-features (Team:Core/Features)

@dakrone dakrone merged commit cfa4c88 into elastic:7.x Mar 10, 2021
@dakrone dakrone deleted the backport/7.x/pr-70179 branch March 10, 2021 00:40
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport :Data Management/ILM+SLM DO NOT USE. Use ":StorageEngine/ILM" or ":Distributed Coordination/SLM" instead. >non-issue Team:Data Management (obsolete) DO NOT USE. This team no longer exists. v7.13.0

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants