Skip to content

[7.x] Make the UpdateRolloverLifecycleDateStep retryable (#50702)#50730

Merged
andreidan merged 1 commit intoelastic:7.xfrom
andreidan:backport/7x-ilm-update-lifecycle-date-step-retryable
Jan 8, 2020
Merged

[7.x] Make the UpdateRolloverLifecycleDateStep retryable (#50702)#50730
andreidan merged 1 commit intoelastic:7.xfrom
andreidan:backport/7x-ilm-update-lifecycle-date-step-retryable

Conversation

@andreidan
Copy link
Copy Markdown
Contributor

This makes the "update-rollover-lifecycle-date" step, which is part of the
rollover action, retryable. It also adds an integration test to check the
step is retried and it eventually succeeds.

(cherry picked from commit 5bf0685)
Signed-off-by: Andrei Dan andrei.dan@elastic.co

Backport of #50702

This makes the "update-rollover-lifecycle-date" step, which is part of the
rollover action, retryable. It also adds an integration test to check the
step is retried and it eventually succeeds.

(cherry picked from commit 5bf0685)
Signed-off-by: Andrei Dan <andrei.dan@elastic.co>
@andreidan andreidan added :Data Management/ILM+SLM DO NOT USE. Use ":StorageEngine/ILM" or ":Distributed Coordination/SLM" instead. backport v7.6.0 labels Jan 8, 2020
@elasticmachine
Copy link
Copy Markdown
Collaborator

Pinging @elastic/es-core-features (:Core/Features/ILM+SLM)

@andreidan
Copy link
Copy Markdown
Contributor Author

@elasticmachine run elasticsearch-ci/2

@andreidan andreidan merged commit 3915d4c into elastic:7.x Jan 8, 2020
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport :Data Management/ILM+SLM DO NOT USE. Use ":StorageEngine/ILM" or ":Distributed Coordination/SLM" instead. v7.6.0

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants