Skip to content

Cherry-pick #26168 to 7.x: Move Filebeat azure module to GA#26237

Merged
narph merged 2 commits intoelastic:7.xfrom
narph:backport_26168_7.x
Jun 10, 2021
Merged

Cherry-pick #26168 to 7.x: Move Filebeat azure module to GA#26237
narph merged 2 commits intoelastic:7.xfrom
narph:backport_26168_7.x

Conversation

@narph
Copy link
Copy Markdown
Contributor

@narph narph commented Jun 10, 2021

Cherry-pick of PR #26168 to 7.x branch. Original message:

What does this PR do?

Why is it important?

Move Filebeat azure module to GA

Checklist

  • My code follows the style guidelines of this project
  • I have commented my code, particularly in hard-to-understand areas
  • I have made corresponding changes to the documentation
  • I have made corresponding change to the default configuration files
  • I have added tests that prove my fix is effective or that my feature works
  • I have added an entry in CHANGELOG.next.asciidoc or CHANGELOG-developer.next.asciidoc.

Related issues

* remove beta from files

* changelog

* regenerate

(cherry picked from commit 088464f)
@botelastic botelastic bot added the needs_team Indicates that the issue/PR needs a Team:* label label Jun 10, 2021
@narph narph self-assigned this Jun 10, 2021
@narph narph added 7.14 Candidate backport Team:Integrations Label for the Integrations team labels Jun 10, 2021
@elasticmachine
Copy link
Copy Markdown
Contributor

Pinging @elastic/integrations (Team:Integrations)

@botelastic botelastic bot removed the needs_team Indicates that the issue/PR needs a Team:* label label Jun 10, 2021
@elasticmachine
Copy link
Copy Markdown
Contributor

elasticmachine commented Jun 10, 2021

💚 Build Succeeded

the below badges are clickable and redirect to their specific view in the CI or DOCS
Pipeline View Test View Changes Artifacts preview

Expand to view the summary

Build stats

  • Build Cause: Pull request #26237 updated

  • Start Time: 2021-06-10T14:16:23.422+0000

  • Duration: 112 min 23 sec

  • Commit: 93f5766

Test stats 🧪

Test Results
Failed 0
Passed 13997
Skipped 2306
Total 16303

Trends 🧪

Image of Build Times

Image of Tests

💚 Flaky test report

Tests succeeded.

Expand to view the summary

Test stats 🧪

Test Results
Failed 0
Passed 13997
Skipped 2306
Total 16303

@narph narph merged commit 2a504ed into elastic:7.x Jun 10, 2021
@narph narph deleted the backport_26168_7.x branch June 10, 2021 16:18
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

7.14 Candidate backport Team:Integrations Label for the Integrations team

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants