Skip to content

Cherry-pick #23490 to 7.x: Fix flaky tests for Metricbeat on Windows 2008 R2#23507

Merged
narph merged 1 commit intoelastic:7.xfrom
narph:backport_23490_7.x
Jan 15, 2021
Merged

Cherry-pick #23490 to 7.x: Fix flaky tests for Metricbeat on Windows 2008 R2#23507
narph merged 1 commit intoelastic:7.xfrom
narph:backport_23490_7.x

Conversation

@narph
Copy link
Copy Markdown
Contributor

@narph narph commented Jan 14, 2021

Cherry-pick of PR #23490 to 7.x branch. Original message:

What does this PR do?

Why is it important?

Checklist

  • My code follows the style guidelines of this project
  • I have commented my code, particularly in hard-to-understand areas
  • I have made corresponding changes to the documentation
  • I have made corresponding change to the default configuration files
  • I have added tests that prove my fix is effective or that my feature works
  • I have added an entry in CHANGELOG.next.asciidoc or CHANGELOG-developer.next.asciidoc.

Related issues

* enable 2008

* [CI] Optional stage instead the mandatory one

windows stage is mandatory, but optional stages are not mandatory for PRs

Co-authored-by: Victor Martinez <VictorMartinezRubio@gmail.com>
(cherry picked from commit 9283a6f)
@narph narph added [zube]: In Review backport Team:Integrations Label for the Integrations team labels Jan 14, 2021
@elasticmachine
Copy link
Copy Markdown
Contributor

Pinging @elastic/integrations (Team:Integrations)

@botelastic botelastic bot added needs_team Indicates that the issue/PR needs a Team:* label and removed needs_team Indicates that the issue/PR needs a Team:* label labels Jan 14, 2021
@narph narph added the windows-2008 Enable builds in the CI for windows-2008 label Jan 14, 2021
@elasticmachine
Copy link
Copy Markdown
Contributor

💚 Build Succeeded

the below badges are clickable and redirect to their specific view in the CI or DOCS
Pipeline View Test View Changes Artifacts preview

Expand to view the summary

Build stats

  • Build Cause: Pull request #23507 opened

    • Start Time: 2021-01-14T11:21:29.272+0000
  • Duration: 46 min 40 sec

  • Commit: 1c5f4c9

Test stats 🧪

Test Results
Failed 0
Passed 2840
Skipped 760
Total 3600

💚 Flaky test report

Tests succeeded.

Expand to view the summary

Test stats 🧪

Test Results
Failed 0
Passed 2840
Skipped 760
Total 3600

@narph narph merged commit 13c4c73 into elastic:7.x Jan 15, 2021
@narph narph deleted the backport_23490_7.x branch January 15, 2021 10:30
@zube zube bot removed the [zube]: Done label Apr 15, 2021
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport Team:Integrations Label for the Integrations team windows-2008 Enable builds in the CI for windows-2008

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants