Skip to content

Cherry-pick #22988 to 7.x: [Winlogbeat] Add configuration category and more security events#23004

Merged
andrewstucki merged 2 commits intoelastic:7.xfrom
andrewstucki:backport_22988_7.x
Dec 9, 2020
Merged

Cherry-pick #22988 to 7.x: [Winlogbeat] Add configuration category and more security events#23004
andrewstucki merged 2 commits intoelastic:7.xfrom
andrewstucki:backport_22988_7.x

Conversation

@andrewstucki
Copy link
Copy Markdown

@andrewstucki andrewstucki commented Dec 9, 2020

Cherry-pick of PR #22988 to 7.x branch. Original message:

What does this PR do?

Adds ECS 1.7 configuration categories for security and sysmon events. Also adds some additional events that might be of interest (i.e. firewall events, etc.)

Checklist

  • My code follows the style guidelines of this project
  • I have commented my code, particularly in hard-to-understand areas
  • I have made corresponding changes to the documentation
  • I have made corresponding change to the default configuration files
  • I have added tests that prove my fix is effective or that my feature works
  • I have added an entry in CHANGELOG.next.asciidoc or CHANGELOG-developer.next.asciidoc.

Related issues

…stic#22988)

* Add configuration category and more events

* Add pull request reference

* Fix bad event.action

(cherry picked from commit b6d97d9)
@andrewstucki andrewstucki requested a review from a team as a code owner December 9, 2020 02:04
@botelastic botelastic bot added the needs_team Indicates that the issue/PR needs a Team:* label label Dec 9, 2020
@elasticmachine
Copy link
Copy Markdown
Contributor

Pinging @elastic/security-external-integrations (Team:Security-External Integrations)

@botelastic botelastic bot removed the needs_team Indicates that the issue/PR needs a Team:* label label Dec 9, 2020
@botelastic
Copy link
Copy Markdown

botelastic bot commented Dec 9, 2020

This pull request doesn't have a Team:<team> label.

@andrewstucki andrewstucki requested a review from a team December 9, 2020 02:04
@elasticmachine
Copy link
Copy Markdown
Contributor

elasticmachine commented Dec 9, 2020

💚 Build Succeeded

the below badges are clickable and redirect to their specific view in the CI or DOCS
Pipeline View Test View Changes Artifacts preview

Expand to view the summary

Build stats

  • Build Cause: Pull request #23004 updated

  • Start Time: 2020-12-09T13:26:14.030+0000

  • Duration: 27 min 30 sec

Test stats 🧪

Test Results
Failed 0
Passed 92
Skipped 0
Total 92

💚 Flaky test report

Tests succeeded.

Expand to view the summary

Test stats 🧪

Test Results
Failed 0
Passed 92
Skipped 0
Total 92

@andrewstucki andrewstucki merged commit 1895c0e into elastic:7.x Dec 9, 2020
@andrewstucki andrewstucki deleted the backport_22988_7.x branch December 9, 2020 14:23
@zube zube bot removed the [zube]: Done label Mar 10, 2021
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants