Skip to content

Cherry-pick #21732 to 7.x: [Filebeat] Add check for context.DeadlineExceeded error#21771

Merged
kaiyan-sheng merged 1 commit intoelastic:7.xfrom
kaiyan-sheng:backport_21732_7.x
Oct 14, 2020
Merged

Cherry-pick #21732 to 7.x: [Filebeat] Add check for context.DeadlineExceeded error#21771
kaiyan-sheng merged 1 commit intoelastic:7.xfrom
kaiyan-sheng:backport_21732_7.x

Conversation

@kaiyan-sheng
Copy link
Copy Markdown
Contributor

@kaiyan-sheng kaiyan-sheng commented Oct 13, 2020

Cherry-pick of PR #21732 to 7.x branch. Original message:

What does this PR do?

This PR adds a check for context.DeadlineExceeded error and reports an INFO level log message instead.

Checklist

  • My code follows the style guidelines of this project
  • I have commented my code, particularly in hard-to-understand areas
  • I have made corresponding changes to the documentation
  • I have made corresponding change to the default configuration files
  • I have added tests that prove my fix is effective or that my feature works
  • I have added an entry in CHANGELOG.next.asciidoc or CHANGELOG-developer.next.asciidoc.

@kaiyan-sheng kaiyan-sheng added [zube]: In Review backport Team:Platforms Label for the Integrations - Platforms team labels Oct 13, 2020
@elasticmachine
Copy link
Copy Markdown
Contributor

Pinging @elastic/integrations-platforms (Team:Platforms)

@botelastic botelastic bot added needs_team Indicates that the issue/PR needs a Team:* label and removed needs_team Indicates that the issue/PR needs a Team:* label labels Oct 13, 2020
@kaiyan-sheng kaiyan-sheng self-assigned this Oct 13, 2020
@elasticmachine
Copy link
Copy Markdown
Contributor

💚 Build Succeeded

the below badges are clickable and redirect to their specific view in the CI or DOCS
Pipeline View Test View Changes Artifacts preview

Expand to view the summary

Build stats

  • Build Cause: [Pull request #21771 opened]

  • Start Time: 2020-10-13T19:30:20.980+0000

  • Duration: 77 min 35 sec

Test stats 🧪

Test Results
Failed 0
Passed 1947
Skipped 259
Total 2206

@kaiyan-sheng kaiyan-sheng merged commit e6315f8 into elastic:7.x Oct 14, 2020
@kaiyan-sheng kaiyan-sheng deleted the backport_21732_7.x branch October 14, 2020 13:22
@zube zube bot removed the [zube]: Done label Jan 13, 2021
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport Team:Platforms Label for the Integrations - Platforms team

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants