Skip to content

Cherry-pick to 7.x: docs: Prepare Changelog for 7.9.2 (#21229)#21404

Merged
kuisathaverat merged 1 commit intoelastic:7.xfrom
kuisathaverat:backport/7.x/pr-21229
Sep 30, 2020
Merged

Cherry-pick to 7.x: docs: Prepare Changelog for 7.9.2 (#21229)#21404
kuisathaverat merged 1 commit intoelastic:7.xfrom
kuisathaverat:backport/7.x/pr-21229

Conversation

@kuisathaverat
Copy link
Copy Markdown
Contributor

Backports the following commits to 7.x:

* Close changelog for 7.9.2

* Update CHANGELOG.next.asciidoc

* Apply suggestions from code review
@kuisathaverat kuisathaverat self-assigned this Sep 30, 2020
@botelastic botelastic bot added the needs_team Indicates that the issue/PR needs a Team:* label label Sep 30, 2020
@kuisathaverat kuisathaverat requested a review from a team September 30, 2020 08:21
@kuisathaverat kuisathaverat added automation Team:Automation Label for the Observability productivity team labels Sep 30, 2020
@botelastic botelastic bot removed the needs_team Indicates that the issue/PR needs a Team:* label label Sep 30, 2020
@elasticmachine
Copy link
Copy Markdown
Contributor

💚 Build Succeeded

Pipeline View Test View Changes Artifacts preview

Expand to view the summary

Build stats

  • Build Cause: [Pull request #21404 opened]

  • Start Time: 2020-09-30T08:10:28.873+0000

  • Duration: 24 min 31 sec

@kuisathaverat kuisathaverat merged commit a52bd6c into elastic:7.x Sep 30, 2020
@kuisathaverat kuisathaverat deleted the backport/7.x/pr-21229 branch December 24, 2020 11:07
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

automation backport Team:Automation Label for the Observability productivity team

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants