Skip to content

Cherry-pick #20815 to 7.x: Update filebeat azure module documentation#20861

Merged
narph merged 1 commit intoelastic:7.xfrom
narph:backport_20815_7.x
Aug 31, 2020
Merged

Cherry-pick #20815 to 7.x: Update filebeat azure module documentation#20861
narph merged 1 commit intoelastic:7.xfrom
narph:backport_20815_7.x

Conversation

@narph
Copy link
Copy Markdown
Contributor

@narph narph commented Aug 31, 2020

Cherry-pick of PR #20815 to 7.x branch. Original message:

What does this PR do?

Previously the azure module was using the kafka input to retrieve the azure logs. The eventhub property could support multiple eventhub names. Switching to the azure-eventhub input, this functionality is not supported (hopefully this will be the case in the future).
This detail was missed in the docs.

Why is it important?

Fix docs.

Checklist

  • My code follows the style guidelines of this project
  • I have commented my code, particularly in hard-to-understand areas
  • I have made corresponding changes to the documentation
  • I have made corresponding change to the default configuration files
  • I have added tests that prove my fix is effective or that my feature works
  • I have added an entry in CHANGELOG.next.asciidoc or CHANGELOG-developer.next.asciidoc.

Related issues

* mofidy doc

* fix doc

* changelog

(cherry picked from commit 7fbbdca)
@botelastic botelastic bot added the needs_team Indicates that the issue/PR needs a Team:* label label Aug 31, 2020
@narph narph self-assigned this Aug 31, 2020
@narph narph added [zube]: In Review backport Team:Platforms Label for the Integrations - Platforms team labels Aug 31, 2020
@elasticmachine
Copy link
Copy Markdown
Contributor

Pinging @elastic/integrations-platforms (Team:Platforms)

@botelastic botelastic bot removed the needs_team Indicates that the issue/PR needs a Team:* label label Aug 31, 2020
@elasticmachine
Copy link
Copy Markdown
Contributor

💚 Build Succeeded

Pipeline View Test View Changes Artifacts preview

Expand to view the summary

Build stats

  • Build Cause: [Pull request #20861 opened]

  • Start Time: 2020-08-31T13:46:33.346+0000

  • Duration: 24 min 20 sec

@narph narph merged commit 662e708 into elastic:7.x Aug 31, 2020
@narph narph deleted the backport_20815_7.x branch August 31, 2020 14:52
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport Team:Platforms Label for the Integrations - Platforms team [zube]: In Review

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants