Skip to content

Cherry-pick #20406 to 7.x: Makes metrics config option required in app_insights#20423

Merged
narph merged 1 commit intoelastic:7.xfrom
narph:backport_20406_7.x
Aug 4, 2020
Merged

Cherry-pick #20406 to 7.x: Makes metrics config option required in app_insights#20423
narph merged 1 commit intoelastic:7.xfrom
narph:backport_20406_7.x

Conversation

@narph
Copy link
Copy Markdown
Contributor

@narph narph commented Aug 4, 2020

Cherry-pick of PR #20406 to 7.x branch. Original message:

What does this PR do?

Makes metrics config option required.

Why is it important?

Validation

Checklist

  • My code follows the style guidelines of this project
  • I have commented my code, particularly in hard-to-understand areas
  • I have made corresponding changes to the documentation
  • I have made corresponding change to the default configuration files
  • I have added tests that prove my fix is effective or that my feature works
  • I have added an entry in CHANGELOG.next.asciidoc or CHANGELOG-developer.next.asciidoc.

* mofidy doc

* config

* changelog

* generate

* regen

* mage fmt

(cherry picked from commit 496e3c9)
@botelastic botelastic bot added the needs_team Indicates that the issue/PR needs a Team:* label label Aug 4, 2020
@narph narph changed the title Cherry-pick #20406 to 7.9: Makes metrics config option required in app_insights Cherry-pick #20406 to 7.x: Makes metrics config option required in app_insights Aug 4, 2020
@narph narph self-assigned this Aug 4, 2020
@narph narph added [zube]: In Review backport Team:Integrations Label for the Integrations team labels Aug 4, 2020
@elasticmachine
Copy link
Copy Markdown
Contributor

Pinging @elastic/integrations (Team:Integrations)

@botelastic botelastic bot removed the needs_team Indicates that the issue/PR needs a Team:* label label Aug 4, 2020
@elasticmachine
Copy link
Copy Markdown
Contributor

💚 Build Succeeded

Pipeline View Test View Changes Artifacts preview

Expand to view the summary

Build stats

  • Build Cause: [Pull request #20423 opened]

  • Start Time: 2020-08-04T12:03:04.540+0000

  • Duration: 61 min 30 sec

Test stats 🧪

Test Results
Failed 0
Passed 3506
Skipped 797
Total 4303

@narph narph merged commit eb914d5 into elastic:7.x Aug 4, 2020
@narph narph deleted the backport_20406_7.x branch August 4, 2020 13:54
@zube zube bot removed the [zube]: Done label Nov 3, 2020
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport Team:Integrations Label for the Integrations team

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants