Skip to content

[19771] Include interval arg in LatencyTests #3952

Closed
Mario-DL wants to merge 1 commit intomasterfrom
improvement/latency_pub_interval
Closed

[19771] Include interval arg in LatencyTests #3952
Mario-DL wants to merge 1 commit intomasterfrom
improvement/latency_pub_interval

Conversation

@Mario-DL
Copy link
Copy Markdown
Contributor

Description

This PR introduces an optional input argument controlling the sleeping time between publications, for the Latency Tests.

@Mergifyio backport 2.11.x 2.10.x 2.6.x

Contributor Checklist

  • Commit messages follow the project guidelines.
  • The code follows the style guidelines of this project.
  • N/A Tests that thoroughly check the new feature have been added/Regression tests checking the bug and its fix have been added; the added tests pass locally
  • N/A Any new/modified methods have been properly documented using Doxygen.
  • N/A Changes are ABI compatible.
  • N/A Changes are API compatible.
  • N/A New feature has been added to the versions.md file (if applicable).
  • N/A New feature has been documented/Current behavior is correctly described in the documentation.
  • Applicable backports have been included in the description.

Reviewer Checklist

  • The PR has a milestone assigned.
  • Check contributor checklist is correct.
  • Check CI results: changes do not issue any warning.
  • Check CI results: failing tests are unrelated with the changes.

Signed-off-by: Mario Dominguez <mariodominguez@eprosima.com>
@Mario-DL Mario-DL added the no-test Skip CI tests if PR marked with this label label Oct 24, 2023
@Mario-DL Mario-DL added this to the v2.12.1 milestone Oct 24, 2023
@EduPonz
Copy link
Copy Markdown

EduPonz commented Nov 8, 2023

I'm going to go ahead and close this for now.

@EduPonz EduPonz closed this Nov 8, 2023
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

no-test Skip CI tests if PR marked with this label

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants