jobs: don't reset next_run when resuming active schedules#69571
Merged
craig[bot] merged 1 commit intocockroachdb:masterfrom Sep 2, 2021
Merged
jobs: don't reset next_run when resuming active schedules#69571craig[bot] merged 1 commit intocockroachdb:masterfrom
craig[bot] merged 1 commit intocockroachdb:masterfrom
Conversation
Member
13b09e7 to
1eac30f
Compare
adityamaru
approved these changes
Aug 31, 2021
9cf5c8b to
be27000
Compare
Consider an active schedule that was created with a specific first_run time. The first_run would populate the next_run_time on the schedule. The resumption of this schedule before it executed would re-evaluate the next runtime based off the schedule's recurrence. This commit changes the scheduling system to only recompute the next run time on paused schedules. Release justification: bug fix Release note (bug fix): Fix a bug where resuming an active schedule would always reset its next run time. This was sometimes undesirable with schedules that had a first_run option specified.
be27000 to
3e0bbe1
Compare
Contributor
Author
|
TFTR |
Contributor
|
Build failed (retrying...): |
Contributor
|
Build succeeded: |
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Consider an active schedule that was created with a specific first_run
time. The first_run would populate the next_run_time on the schedule.
The resumption of this schedule before it executed would re-evaluate the
next runtime based off the schedule's recurrence.
This commit changes the scheduling system to only recompute the next run
time on paused schedules.
Release justification: bug fix
Release note (bug fix): Fix a bug where resuming an active schedule
would always reset its next run time. This was sometimes undesirable
with schedules that had a first_run option specified.