Skip to content

Celestia Core Devs Call 23 #245

@Flayermind

Description

@Flayermind

Celestia Core Devs Call 23

Celestia_Core_Devs_Call

Meeting Information

When: Wednesday, February 05, 5:00 PM UTC, 60 minutes max
Where: Youtube Livestream

Agenda

  • Working Groups Updates
    • Updates from DA Working Group
      • From the last DA WG call: the Light node will have an option to configure a samples retention period, with possible values ranging from 1 to 30 days. The lowest value can save up to 25GB of storage space. Additionally, the sampling pruning window should be decoupled from the header pruning window.
      • The reconstruction architecture design document is now available here: https://github.com/walldiss/celestia-node/blob/reconstruction-adr/docs/adr/reconstruction.md
    • Updates from Interface Working Group
    • Updates from ZK Working Group
      • We decided on the wg call that there’s sufficient clarity on the design to remove the call and just do async eng updates + ad hoc scheduled calls if needed.
      • CIP covering predominantly the groth16 IBC verifier will be written and made available for review after the initial implemenation is complete.
  • Discuss draft CIP: reduce inflation #249

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions