-
Notifications
You must be signed in to change notification settings - Fork 4.4k
Open
Labels
P1I'll work on this now. (Assignee required)I'll work on this now. (Assignee required)releaseteam-OSSIssues for the Bazel OSS team: installation, release processBazel packaging, websiteIssues for the Bazel OSS team: installation, release processBazel packaging, websitetype: process
Description
Status of Bazel 8.6.0
- Expected first release candidate date: 2026-02-09
- Expected release date: 2026-02-16
- List of release blockers
To report a release-blocking bug, please add a comment with the text @bazel-io flag to the issue. A release manager will triage it and add it to the milestone.
To cherry-pick a mainline commit into 8.6.0, simply send a PR against the release-8.6.0 branch.
Task list:
- Create release candidate
- Check downstream projects
- Create draft release announcement
- Push the release and notify package maintainers
- Update the documentation
- Update the release page
Metadata
Metadata
Assignees
Labels
P1I'll work on this now. (Assignee required)I'll work on this now. (Assignee required)releaseteam-OSSIssues for the Bazel OSS team: installation, release processBazel packaging, websiteIssues for the Bazel OSS team: installation, release processBazel packaging, websitetype: process