Skip to content

[BUG] After the master is fault-tolerant, it cannot resume operation #2799

@xingchun-chen

Description

@xingchun-chen
  1. Run the workflow, the workflow runs on master1
  2. Stop the workflow and stop the master1 service
  3. After master2 is fault-tolerant, the workflow stops, click "Resume" again, the workflow is not running
    1.运行工作流,工作流在master1运行
    2.停止工作流,停掉master1服务
    3.master2容错后,工作流停止,再次点击“恢复运行”,工作流没有运行

Which version of Dolphin Scheduler:
-[dev_1.3.0]

Metadata

Metadata

Assignees

Labels

bugSomething isn't working

Type

No type

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions