Skip to content

[Backport staging-25.05] strace: 6.15 -> 6.16#431765

Merged
Ma27 merged 1 commit intostaging-25.05from
backport-431353-to-staging-25.05
Aug 7, 2025
Merged

[Backport staging-25.05] strace: 6.15 -> 6.16#431765
Ma27 merged 1 commit intostaging-25.05from
backport-431353-to-staging-25.05

Conversation

@nixpkgs-ci
Copy link
Copy Markdown
Contributor

@nixpkgs-ci nixpkgs-ci bot commented Aug 7, 2025

Bot-based backport to staging-25.05, triggered by a label in #431353.

  • Before merging, ensure that this backport is acceptable for the release.
    • Even as a non-committer, if you find that it is not acceptable, leave a comment.

@nixpkgs-ci nixpkgs-ci bot mentioned this pull request Aug 7, 2025
13 tasks
@nixpkgs-ci nixpkgs-ci bot added 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-darwin: 1-10 This PR causes between 1 and 10 packages to rebuild on Darwin. 10.rebuild-linux: 501-1000 This PR causes many rebuilds on Linux and should normally target the staging branches. 4.workflow: backport This targets a stable branch labels Aug 7, 2025
@nix-owners nix-owners bot requested review from Ma27, alyssais and globin August 7, 2025 14:38
@Ma27 Ma27 merged commit e354d63 into staging-25.05 Aug 7, 2025
27 of 31 checks passed
@Ma27 Ma27 deleted the backport-431353-to-staging-25.05 branch August 7, 2025 14:50
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

4.workflow: backport This targets a stable branch 10.rebuild-darwin: 1-10 This PR causes between 1 and 10 packages to rebuild on Darwin. 10.rebuild-linux: 501-1000 This PR causes many rebuilds on Linux and should normally target the staging branches. 10.rebuild-linux: 501+ This PR causes many rebuilds on Linux and should normally target the staging branches.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants