Skip to content

Sam 392 pv battery cost updates#421

Merged
brtietz merged 8 commits into
developfrom
sam_392_pv_battery_cost_updates
Nov 9, 2020
Merged

Sam 392 pv battery cost updates#421
brtietz merged 8 commits into
developfrom
sam_392_pv_battery_cost_updates

Conversation

@brtietz

@brtietz brtietz commented Nov 6, 2020

Copy link
Copy Markdown
Collaborator

Cost updates for PV and batteries based on:

https://github.com/NREL/SAM-documentation/blob/master/Defaults%20References%20and%20Tools/pv_and_battery_source_sheets/Inputs%20for%20SAM.xlsx for PV and
https://github.com/NREL/SAM-documentation/blob/master/Defaults%20References%20and%20Tools/pv_and_battery_source_sheets/BESS%20and%20PV%2BBESS%20Costs%20for%20SAM%202020-11-02.xlsx

Increase default PV sizes to 50 MW for utility scale and 500 kW for commercial. Re-order battery cost inputs in order to make it clear that $/kW already includes BOS and installation for the battery.

Brian Mirletz added 7 commits November 4, 2020 15:21
…m design more consistent with defaults on the page. Update test results. Changes are expected due to cost differences and increases in size for commercial and front of meter systems in previous commits
@brtietz brtietz added pv pvsam1, pvwatts, hcpv battery labels Nov 6, 2020
@brtietz brtietz added this to the 2021 Release milestone Nov 6, 2020
@brtietz brtietz linked an issue Nov 6, 2020 that may be closed by this pull request
@cpaulgilman

Copy link
Copy Markdown
Collaborator

Looks good. I tweaked the UI a little in aeccd7b:

image

@brtietz brtietz merged commit f4fdd3c into develop Nov 9, 2020
@brtietz brtietz deleted the sam_392_pv_battery_cost_updates branch December 3, 2020 20:07
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

battery pv pvsam1, pvwatts, hcpv

Projects

None yet

Development

Successfully merging this pull request may close these issues.

PV & PV + Battery Cost Updates

3 participants