Skip to content

Production Based Incentive references wrong cell for generation in send to excel with eqns for host-developer #1473

@brtietz

Description

@brtietz

Describe the bug

Host-developer's send to excel w/equations references cell C10 for energy production for the production based incentive, whereas cell C7 is likely more appropriate.

To Reproduce

Steps to reproduce the behavior:

  1. Compare cash flow in SAM vs send to excel to equations in attached zip:
    send_to_excel_host_developer.zip

Expected behavior

PBI should reference gross generation or net energy to grid, not the cell for a technology that is not implemented.

Operating System and Version

  • Version 2022.11.21, develop

Metadata

Metadata

Assignees

Labels

Type

No type
No fields configured for issues without a type.

Projects

No projects

Relationships

None yet

Development

No branches or pull requests

Issue actions