Skip to content

Remove Construction Financing UI page from LCOE / LCOH configurations #1464

@cpaulgilman

Description

@cpaulgilman

Some IPH models have an Installation Costs page for LCOH configurations

  • IPH MSPT
  • IPH MSLF

Some CSP and IPH models have Installation Costs for No Financial configurations:

  • CSP MSPT
  • IPH MSPT
  • IPH MSLF

These cost inputs are required by some IPH/CSP performance models in SSC, so must be provided for LCOE/H and No Financial configurations.

However, these also include a Construction Financing input page, which creates a potential conflict/confusion with the construction cost input on the Financial Parameters page for the Fixed Charge Rate (FCR) Method (LCOE/H Calculator). Consider removing Construction Costs page if it is not needed by the performance models.

Example .sam files: construction-financing-files.zip

(In the future, we may want to add an Installation Costs to all LCOE/H Calculator configurations to allow users to use more detailed cost categories than the single "Total Capital Cost" input to the FCR model.)

Metadata

Metadata

Labels

bugdev bugInternal bug that should not be included in release notes

Type

No type
No fields configured for issues without a type.

Projects

No projects

Relationships

None yet

Development

No branches or pull requests

Issue actions