Describe the bug
See https://sam.nrel.gov/forum/forum-general/4147
pdf-report-large-load-test.zip
To Reproduce
Steps to reproduce the behavior:
- Create a PVWatts / Commercial Case.
- On the Electric Load page, set the load scaling factor to 1000.
- On the Case menu, click Create report.
Describe the bug
See https://sam.nrel.gov/forum/forum-general/4147
pdf-report-large-load-test.zip
To Reproduce
Steps to reproduce the behavior: