Describe the bug
See https://sam.nrel.gov/forum/forum-general/4119 for a description and sample file.
Link to sample file: https://sam.nrel.gov/forum/attachment/1421
From @brtietz:
...the grid outage code should always finish. If the system is too small, the extra load should be recorded as unmet critical load. There are some while loops in there that should converge, but it looks [this is] a case where they don’t.
To Reproduce
Steps to reproduce the behavior:
- Open file attached to forum topic above.
- Go to the 30 kW case.
- Click Simulate.
Simulation starts but then progress bar stops at around 30%.
Expected behavior
Simulation should finish and results should show unmet critical load.
A clear and concise description of what you expected to happen.
Operating System and Version
- Tested on Mac and Windows
- SAM 2022.11.21
Describe the bug
See https://sam.nrel.gov/forum/forum-general/4119 for a description and sample file.
Link to sample file: https://sam.nrel.gov/forum/attachment/1421
From @brtietz:
To Reproduce
Steps to reproduce the behavior:
Simulation starts but then progress bar stops at around 30%.
Expected behavior
Simulation should finish and results should show unmet critical load.
A clear and concise description of what you expected to happen.
Operating System and Version