Update Commercial, Residential battery cost assumptions#833
Merged
Conversation
ATB $ figures, adjusted $/kW inputs and % indirect battery costs accordingly
…ixedcost_updates
Collaborator
|
@cpaulgilman @janinefreeman - We're running into some trouble with commercial systems here: the ATB only presents stand alone commercial (no hybrids), and the underlying report (https://www.nrel.gov/docs/fy21osti/77324.pdf) presents a system size roughly twice as big as the default in SAM. What's an acceptable fudge factor on the total installed cost (either as a percent or in $/Wdc)? |
…ixedcost_updates
…ixedcost_updates
colocation costs), reset battery indirect cost % defaults
brtietz
approved these changes
Dec 1, 2021
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Description
Based on discussions about the ATB cost optimization procedures, the fixed $ cost for commercial and residential battery systems does not change for changing system sizes (only changes for change in economy of scale). To be more consistent with this implementation, the default cost values were changed to use the $/kW inputs from the ATB and by adding the fixed $ cost to Engineering and developer overhead fixed costs. The % of indirect cost attributed to battery cost was updated for each configuration to allocate the correct $ amount of fixed cost to the battery system for combined systems.
Fixes # (issue)