Help updates for 2022.11.21 Patch 1#1359
Merged
Merged
Conversation
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Weekend and weekday schedules up to 36 periods, 0=10, a-z=11-36.
MSPT with ETES (hybrid ETES) after Ty merges new feature. See "MSPT-ETES hybrid model" email 1/24/22, https://github.com/NREL/ssc/tree/etes_dispatch, https://github.com/NREL/SAM/tree/etes_mspt_hybrid
Battery time series results (see brian email "2022 release battery output definitions"
PV-Battery application of AC and transformer losses.
CSP System Control, fix CSP parasitic equations for plant energy consuption.
PTES input page topics.
Inverter time series outputs and multiple MPPT inputs.
Revise revenue capacity credit percentage to explain application for systems with batteries.
Revise for new load download button and TMY3 load data limitations
Fix sales tax descriptions for all performance models.
Add missing standalone battery installation cost topic.
ITC basis depends on depreciation allocations. See "ITC Qualifying Costs" in Deprecation and ITC table on Cash Flow sheet.
On Incentives page, if you specify a single value for the ITC amount as amount or percentage, that value applies to year 1. If you specify a maximum as a single value and the amount for multiple years, the maximum applies to all years.
Revise ITC storage 75% cliff description to be more general in case IRS rules change.
Battery dispatch FOM: Update PV smoothing paper reference
Revise sCO2 availability for older versions.