Skip to content

Backport #83528 to 24.8: Bring pre-pull stage for integration tests back#83565

Merged
Felixoid merged 1 commit into24.8from
backport/24.8/83528
Jul 9, 2025
Merged

Backport #83528 to 24.8: Bring pre-pull stage for integration tests back#83565
Felixoid merged 1 commit into24.8from
backport/24.8/83528

Conversation

@robot-clickhouse-ci-2
Copy link
Copy Markdown
Contributor

Original pull-request #83528
Cherry-pick pull-request #83559

This pull-request is a last step of an automated backporting.
Treat it as a standard pull-request: look at the checks and resolve conflicts.
Merge it only if you intend to backport changes to the target branch, otherwise just close it.

The PR source

The PR is created in the CI job

@robot-clickhouse-ci-2 robot-clickhouse-ci-2 added the pr-backport Changes, backported to release branch. Do not use manually - automated use only! label Jul 9, 2025
@robot-ch-test-poll4
Copy link
Copy Markdown
Contributor

robot-ch-test-poll4 commented Jul 9, 2025

This is an automated comment for commit abfe447 with description of existing statuses. It's updated for the latest CI running

❌ Click here to open a full report in a separate page

Check nameDescriptionStatus
Integration testsThe integration tests report. In parenthesis the package type is given, and in square brackets are the optional part/total tests❌ failure
Successful checks
Check nameDescriptionStatus
BuildsThere's no description for the check yet, please add it to tests/ci/ci_config.py:CHECK_DESCRIPTIONS✅ success
Compatibility checkChecks that clickhouse binary runs on distributions with old libc versions. If it fails, ask a maintainer for help✅ success
Docker keeper imageThe check to build and optionally push the mentioned image to docker hub✅ success
Docker server imageThe check to build and optionally push the mentioned image to docker hub✅ success
Install packagesChecks that the built packages are installable in a clear environment✅ success
Stateful testsRuns stateful functional tests for ClickHouse binaries built in various configurations -- release, debug, with sanitizers, etc✅ success
Stateless testsRuns stateless functional tests for ClickHouse binaries built in various configurations -- release, debug, with sanitizers, etc✅ success
Stress testRuns stateless functional tests concurrently from several clients to detect concurrency-related errors✅ success

@Felixoid
Copy link
Copy Markdown
Member

Felixoid commented Jul 9, 2025

The patch works, no reason to wait more

@Felixoid Felixoid merged commit 4645747 into 24.8 Jul 9, 2025
60 of 73 checks passed
@Felixoid Felixoid deleted the backport/24.8/83528 branch July 9, 2025 22:05
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

pr-backport Changes, backported to release branch. Do not use manually - automated use only!

Projects

None yet

Development

Successfully merging this pull request may close these issues.

5 participants