We are dedicated to the upkeep and improvement of CNC. We take pride in managing the operation and maintenance of the campus infrastructure, including building repairs, building automation systems, renovations and construction, landscaping, and capital projects.


Campus Access & Updates

Stay informed. Bookmark this page to get the latest updates on construction activity, access changes, and project timelines across campus. This page is updated regularly to help you plan ahead.

Need help navigating campus? View all accessible doors throughout the Main Building.


Building Envelope Project

Building envelope upgrades continue across the 100, 300, and 700 Blocks of the Prince George Campus - including siding installation, window sealing, roofing, and exterior finishing work.

Work includes ongoing mechanical roof activity in the 300 Block, interior window trim finishes, and preparation for new concrete work on the north side. In the 700 Block, crews are installing metal framing, exterior panels, and completing roof work, with some noisy activities. Window work continues in the courtyard stairwell between the 300 and 700 Blocks.

Impacts: Some entrances may be partially or temporarily closed. Expect noise, dust, visual disruptions, and temporary detours in affected areas. 

Accessibility & Detours
Please use posted detour routes and alternate entrances during closures until further notice.

  • Accessible parking at the South Main Entrance is temporarily relocated near the crosswalk ramp.
  • The following entrances are closed or partially closed:
    • Main entrance (partially closed)
    • East entrance (fully closed due to window work)
    • Two 1st-floor exits in the 300 Block
    • Back entrance of the Health and Wellness Center (closed except for emergencies)

Network Renewal Project

The Network Renewal Project is nearing completion across CNC campuses. Current work focuses on minor efficiencies and final adjustments to fully close out the project.

No major disruptions are expected during this phase, and work will be limited to small-scale updates within network spaces.


Please follow all posted signage and detours. Your safety is our priority. Thank you for your patience.

For detailed updates on each project, click on Current Updates below.

Edited: March 27, 2026

PG Campus Level 1
Construction Map

PG 1st floorEnlarge photo

PG Campus Level 2
Construction Map

PG 2nd floorEnlarge photo

PG Campus Level 3
Construction Map

PG 3rd floorEnlarge photo

Current Projects

CNC - Final Cladding Locations_1 - Photo

Building Envelope Project

Current Update

The Building Envelope Project at CNC’s Prince George campus, funded by the Ministry of Infrastructure, enhances campus sustainability and energy efficiency for a resilient, future-ready environment.

 

Network Renewal

Network Renewal

Current Update

CNC’s Network Renewal Project, funded by the Ministry of Infrastructure, is upgrading our digital infrastructure to ensure faster, more reliable connectivity campus-wide.


Completed Projects

Entrance_Prince_George-2

Main Entrance Renewal

Completed

Campus_Life-Prince_George-7683

Transit Shelter Upgrade

Completed

Gym 4

500 Block Flooring

Completed

Main Entrance Art Installation

Completed


Frequently Asked Questions

Construction on Campus FAQ

  • Why does the College undertake construction projects?

  • Where does the funding for construction projects come from?

  • What disruptions can I expect during a construction project?

  • Are there alternate routes during construction?

  • How are accessibility needs addressed during construction?

  • Who do I contact with questions or concerns about construction?