{"id":1000,"date":"2022-08-25T13:27:11","date_gmt":"2022-08-25T17:27:11","guid":{"rendered":"https:\/\/buffaloccprod.wpengine.com\/?p=1000"},"modified":"2025-04-02T11:17:49","modified_gmt":"2025-04-02T15:17:49","slug":"edison-educational-campus","status":"publish","type":"post","link":"https:\/\/buffaloconstruct.com\/edison-educational-campus\/","title":{"rendered":"RSMP: Edison Career &#038; Technology High School"},"content":{"rendered":"<p>Buffalo Construction Consultants, Inc. completed multiple phases of work on Edison Technical Campus, as part of Phase 2B of the Rochester Schools Modernization Program (RSMP). In the spring of 2018, our team began structural repairs within the building and reprogramming approximately 50,000 SF of classroom space. A next phase of work included site work, roof repairs, structural repairs, and significant classroom and programmatic space upgrades to approximately 50,000 SF. This project was completed in August 2020.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As part of Phase 2 of the Rochester School Modernization Program, the renovation project at Edison Career and Technology High School, a career and technical education-focused program, was completed in 2020 by the team at Buffalo Construction Consultants (BCC) and design partner LaBella Associates. <\/p>\n","protected":false},"author":3,"featured_media":1003,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":"","_links_to":"","_links_to_target":""},"categories":[35,42],"tags":[],"dipi_cpt_category":[],"class_list":["post-1000","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-portfolio","category-k-12-education"],"acf":[],"_links":{"self":[{"href":"https:\/\/buffaloconstruct.com\/wp-json\/wp\/v2\/posts\/1000","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/buffaloconstruct.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buffaloconstruct.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buffaloconstruct.com\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/buffaloconstruct.com\/wp-json\/wp\/v2\/comments?post=1000"}],"version-history":[{"count":0,"href":"https:\/\/buffaloconstruct.com\/wp-json\/wp\/v2\/posts\/1000\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buffaloconstruct.com\/wp-json\/wp\/v2\/media\/1003"}],"wp:attachment":[{"href":"https:\/\/buffaloconstruct.com\/wp-json\/wp\/v2\/media?parent=1000"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buffaloconstruct.com\/wp-json\/wp\/v2\/categories?post=1000"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buffaloconstruct.com\/wp-json\/wp\/v2\/tags?post=1000"},{"taxonomy":"dipi_cpt_category","embeddable":true,"href":"https:\/\/buffaloconstruct.com\/wp-json\/wp\/v2\/dipi_cpt_category?post=1000"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}