{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,12]],"date-time":"2025-12-12T13:29:15Z","timestamp":1765546155788,"version":"3.40.5"},"reference-count":89,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2016,12,1]],"date-time":"2016-12-01T00:00:00Z","timestamp":1480550400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Computers in Industry"],"published-print":{"date-parts":[[2016,12]]},"DOI":"10.1016\/j.compind.2016.08.004","type":"journal-article","created":{"date-parts":[[2016,9,30]],"date-time":"2016-09-30T08:03:09Z","timestamp":1475222589000},"page":"28-45","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":22,"special_numbering":"C","title":["A framework for integrating syntax, semantics and pragmatics for computer-aided professional practice: With application of costing in construction industry"],"prefix":"10.1016","volume":"83","author":[{"ORCID":"https:\/\/orcid.org\/0000-0001-8510-2820","authenticated-orcid":false,"given":"Shen","family":"Xu","sequence":"first","affiliation":[]},{"given":"Kecheng","family":"Liu","sequence":"additional","affiliation":[]},{"given":"Llewellyn C.M.","family":"Tang","sequence":"additional","affiliation":[]},{"given":"Weizi","family":"Li","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"key":"10.1016\/j.compind.2016.08.004_bib0005","doi-asserted-by":"crossref","first-page":"164","DOI":"10.1016\/j.autcon.2008.07.001","article-title":"Web-based conceptual cost estimates for construction projects using evolutionary fuzzy neural inference model","volume":"18","author":"Cheng","year":"2009","journal-title":"Autom. Constr."},{"key":"10.1016\/j.compind.2016.08.004_bib0010","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1016\/0167-188X(90)90115-X","article-title":"Beyond Parametrics: the role of subjectivity in cost models","volume":"14","author":"Beltramo","year":"1988","journal-title":"Elsevier Eng. Costs Prod. Econ. An Int. J. Ind."},{"key":"10.1016\/j.compind.2016.08.004_bib0015","article-title":"The Eurostat construction price surveys: history, current methodology and new ways for the future","author":"Stapel","year":"2002","journal-title":"Int. Conf. ICP, World Bank"},{"year":"2010","series-title":"A Comparative Study of Regression Analysis, Neural Networks and Case-based Reasoning for Early Range Cost Estimation of Mass Housing Projects","author":"Karanci","key":"10.1016\/j.compind.2016.08.004_bib0020"},{"key":"10.1016\/j.compind.2016.08.004_bib0025","unstructured":"U.S. Department of Energy, Cost Estimating Guide, Washington D.C. https:\/\/www.directives.doe.gov\/directives-documents\/400-series\/0413.3-EGuide-21 (2011)."},{"year":"2008","series-title":"Parametric Estimating Handbook","author":"International Society of Parametric Analysts","key":"10.1016\/j.compind.2016.08.004_bib0030"},{"key":"10.1016\/j.compind.2016.08.004_bib0035","series-title":"Review on Cost Estimation Methods for Software Development","first-page":"132","author":"Shivani","year":"2013"},{"key":"10.1016\/j.compind.2016.08.004_bib0040","doi-asserted-by":"crossref","first-page":"2573","DOI":"10.1016\/j.buildenv.2006.06.007","article-title":"A case-based reasoning cost estimating model using experience by analytic hierarchy process","volume":"42","author":"An","year":"2007","journal-title":"Build. Environ."},{"key":"10.1016\/j.compind.2016.08.004_bib0045","doi-asserted-by":"crossref","first-page":"694","DOI":"10.1016\/j.ijpe.2011.05.018","article-title":"Detailed cost estimating in the automotive industry: data and information requirements","volume":"133","author":"Roy","year":"2011","journal-title":"Int. J. Prod. Econ."},{"key":"10.1016\/j.compind.2016.08.004_bib0050","unstructured":"L.C. Briand, K. El Emam, F. Bomarius, COBRA: A Hybrid Method for Software Cost Estimation, Benchmarking, and Risk Assessment COBRA: A Hybrid Method for Software Cost Estimation, Benchmarking, and Risk Assessment, 24 (n.d.)."},{"year":"2002","series-title":"Construction Cost Data Workbook","author":"Sinclair","key":"10.1016\/j.compind.2016.08.004_bib0055"},{"year":"2008","series-title":"NASA Cost Estimation Handbook","author":"Isakowitz","key":"10.1016\/j.compind.2016.08.004_bib0060"},{"key":"10.1016\/j.compind.2016.08.004_bib0065","first-page":"1","article-title":"A literature review of expert problem solving using analogy","author":"Mair","year":"2009","journal-title":"Eval. Assess. Softw. Eng."},{"key":"10.1016\/j.compind.2016.08.004_bib0070","unstructured":"RSMeans, RSMeans Building Construction Cost Data 2013, https:\/\/www.rsmeans.com\/ (2013)."},{"key":"10.1016\/j.compind.2016.08.004_bib0075","unstructured":"BCIS, Standard Form: Property Occupancy Cost Analysis Standard Form of Property Occupancy Cost Analysis, RICS. (n.d.)."},{"key":"10.1016\/j.compind.2016.08.004_bib0080","doi-asserted-by":"crossref","first-page":"841","DOI":"10.1061\/(ASCE)CO.1943-7862.0000053","article-title":"Contextual information requirements of cost estimators from past construction projects","volume":"135","author":"Kiziltas","year":"2009","journal-title":"J. Constr. Eng. Manag."},{"year":"1995","series-title":"Cost Estimators Reference Manual","author":"Stewart","key":"10.1016\/j.compind.2016.08.004_bib0085"},{"year":"1999","series-title":"Department of Defence, Parametric Estimating Handbook","key":"10.1016\/j.compind.2016.08.004_bib0090"},{"key":"10.1016\/j.compind.2016.08.004_bib0095","doi-asserted-by":"crossref","first-page":"117","DOI":"10.1080\/09544829308914776","article-title":"A parametric approach to cost estimating at the conceptual stage of design","volume":"4","author":"Mileham","year":"1993","journal-title":"J. Eng. Des."},{"key":"10.1016\/j.compind.2016.08.004_bib0100","doi-asserted-by":"crossref","first-page":"67","DOI":"10.1016\/0950-5849(95)01045-9","article-title":"Expert judgement as an estimating method","volume":"38","author":"Hughes","year":"1996","journal-title":"Inf. Softw. Technol."},{"key":"10.1016\/j.compind.2016.08.004_bib0105","doi-asserted-by":"crossref","first-page":"23","DOI":"10.1016\/S1474-0346(03)00017-X","article-title":"A generic feature-driven activity-based cost estimation process","volume":"17","author":"Staub-French","year":"2003","journal-title":"Adv. Eng. Inf."},{"key":"10.1016\/j.compind.2016.08.004_bib0110","unstructured":"S. Staub-French M. Fischer J. Kunz B. Paulson K. Ishii, An Ontology for Relating Features of Building Product Models with Construction Activities to Support Cost Estimating Cent. Integr. Facil. Eng. Work. Pap. 70. Standford 2002 http:\/\/www.stanford.edu\/group\/cife\/online.publications\/WP070.pdf"},{"issue":"4","key":"10.1016\/j.compind.2016.08.004_bib0115","doi-asserted-by":"crossref","first-page":"243","DOI":"10.1061\/(ASCE)0887-3801(2003)17:4(243)","article-title":"An ontology for relating features with activities to calculate costs","volume":"17","author":"Staub-French","year":"2003","journal-title":"J. Comput. Civil Eng."},{"key":"10.1016\/j.compind.2016.08.004_bib0120","first-page":"617","article-title":"An ontology-driven house-building labour cost estimation in Cameroon","volume":"16","author":"Abanda","year":"2011","journal-title":"J. Inf. Technol. Constr."},{"issue":"4","key":"10.1016\/j.compind.2016.08.004_bib0125","doi-asserted-by":"crossref","first-page":"302","DOI":"10.1061\/(ASCE)CP.1943-5487.0000090","article-title":"Ontology for Relating Risk and Vulnerability to Cost Overrun in International Projects","volume":"25","author":"Fidan","year":"2011","journal-title":"J. Comput. Civil Eng."},{"key":"10.1016\/j.compind.2016.08.004_bib0130","series-title":"Proceeding CIB W78 2012 29th Int. Conf.","first-page":"17","article-title":"Framework for automatic construction cost estimation based on BIM and ontology technology","author":"Ma","year":"2012"},{"key":"10.1016\/j.compind.2016.08.004_bib0135","doi-asserted-by":"crossref","first-page":"96","DOI":"10.1016\/j.autcon.2013.10.020","article-title":"BIM and ontology-based approach for building cost estimation","volume":"41","author":"Lee","year":"2014","journal-title":"Autom. Constr."},{"key":"10.1016\/j.compind.2016.08.004_bib0140","doi-asserted-by":"crossref","first-page":"5563","DOI":"10.1016\/j.eswa.2013.04.027","article-title":"Trends in built environment semantic web applications: where are we today?","volume":"40","author":"Abanda","year":"2013","journal-title":"Expert Syst. Appl."},{"key":"10.1016\/j.compind.2016.08.004_bib0145","doi-asserted-by":"crossref","first-page":"849","DOI":"10.3390\/buildings4040849","article-title":"Considering the feasibility of semantic model design in the built-Environment","volume":"4","author":"Grzybek","year":"2014","journal-title":"Buildings"},{"key":"10.1016\/j.compind.2016.08.004_bib0150","doi-asserted-by":"crossref","first-page":"743","DOI":"10.1016\/j.future.2010.07.005","article-title":"The open provenance model core specification (V1.1)","volume":"27","author":"Moreau","year":"2011","journal-title":"Futur. Gener. Comput. Syst."},{"key":"10.1016\/j.compind.2016.08.004_bib0155","doi-asserted-by":"crossref","first-page":"126","DOI":"10.1016\/j.autcon.2012.11.020","article-title":"Semi-automatic and specification-compliant cost estimation for tendering of building projects based on IFC data of design model","volume":"30","author":"Ma","year":"2013","journal-title":"Autom. Constr."},{"issue":"2","key":"10.1016\/j.compind.2016.08.004_bib0160","doi-asserted-by":"crossref","first-page":"133","DOI":"10.1017\/S0890060403172034","article-title":"A Feature Ontology to Support Construction Cost Estimating","volume":"17","author":"Staub-French","year":"2003","journal-title":"Artif. Intell. Eng. Des. Anal. Manuf."},{"issue":"5","key":"10.1016\/j.compind.2016.08.004_bib0165","doi-asserted-by":"crossref","DOI":"10.1061\/(ASCE)CP.1943-5487.0000230","article-title":"Ontology-Based feature modeling for construction information extraction from a building information model","volume":"27","author":"Nepal","year":"2012","journal-title":"J. Comput. Civ. Eng."},{"key":"10.1016\/j.compind.2016.08.004_bib0170","first-page":"707","article-title":"Ontology-Based Computerized Representation of Specifications for Construction Cost Estimation","author":"Ma","year":"2013","journal-title":"Proc. of the 30th CIB W78 International Conference"},{"key":"10.1016\/j.compind.2016.08.004_bib0175","doi-asserted-by":"crossref","first-page":"5219","DOI":"10.1016\/j.eswa.2015.02.029","article-title":"A rule-based semantic approach for automated regulatory compliance in the construction sector","volume":"42","author":"Beach","year":"2015","journal-title":"Expert Syst. Appl."},{"key":"10.1016\/j.compind.2016.08.004_bib0180","doi-asserted-by":"crossref","first-page":"15","DOI":"10.1080\/014492900118768","article-title":"Understanding the Roles of Signs and Norms in Organisations-A semiotic approach to informatio n systems design","volume":"19","author":"Stamper","year":"2000","journal-title":"J. Behav. Inf. Technol."},{"year":"1973","series-title":"Information in Business and Administrative Systems","author":"Stamper","key":"10.1016\/j.compind.2016.08.004_bib0185"},{"year":"2000","series-title":"Semiotics in Information Systems Engineering","author":"Liu","key":"10.1016\/j.compind.2016.08.004_bib0190"},{"key":"10.1016\/j.compind.2016.08.004_bib0195","unstructured":"ISO 10303-21, Industrial automation systems and integration \u2013 Product data representation and exchange\u2014Part 21: Implementation methods: Clear text encoding of the exchange structure (2002)."},{"key":"10.1016\/j.compind.2016.08.004_bib0200","unstructured":"ISO 10303-28, Industrial automation systems and integration\u2014Product data representation and exchange\u2014Part 28: Implementation methods: XML representations of EXPRESS schema and data, (2007)."},{"key":"10.1016\/j.compind.2016.08.004_bib0205","unstructured":"buildingSMART International Limited, IFC, Standard Build. Int. Ltd. 2013 http:\/\/www.buildingsmart-tech.org\/specifications\/ifc-overview, (accessed 07.25.16)."},{"key":"10.1016\/j.compind.2016.08.004_bib0210","unstructured":"The Royal Institution of Chartered Surveyors, RICS New Rules of MEASUREMENT Bill of Quantities for Works Procurement, Coventry (2011)."},{"key":"10.1016\/j.compind.2016.08.004_bib0215","doi-asserted-by":"crossref","first-page":"645","DOI":"10.1109\/HICSS.1994.323455","article-title":"Organisational dynamics, social norms and information systems","author":"Stamper","year":"1994","journal-title":"1994 Proc. Twenty-Seventh Hawaii Int. Conf. Syst. Sci."},{"key":"10.1016\/j.compind.2016.08.004_bib0220","unstructured":"H. Grzybek S. Gulliver Z. Huang, Inclusion of Temporal Databases with Industry Foundation Classes-A Basis for Adaptable Intelligent Buildings, in: ICISO. http:\/\/scholar.google.com\/scholar?hl=en&btnG=Search&q=intitle:Inclusion+of+Temporal+Databases+with+Industry+Foundation+Classes+-+a+basis+for+adaptable+intelligent+buildings#0, 2010 (accessed 24.60.14)."},{"key":"10.1016\/j.compind.2016.08.004_bib0225","first-page":"14","article-title":"Semantic building information model and multimedia for facility management","volume":"1","author":"Nicolle","year":"2011","journal-title":"Building"},{"key":"10.1016\/j.compind.2016.08.004_bib0230","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1007\/s10270-010-0178-4","article-title":"Model interoperability in building information modelling","volume":"11","author":"Steel","year":"2010","journal-title":"Softw. Syst. Model"},{"key":"10.1016\/j.compind.2016.08.004_bib0235","unstructured":"Z. Shen, Semantic 3D CAD and Its Applications in Construction Industry \u2014 An Outlook of Construction Data Visualization (2007)."},{"year":"2011","series-title":"Formal Specification of Industry Foundation Class Concepts Using Engineering Ontologies","author":"Venugopal","key":"10.1016\/j.compind.2016.08.004_bib0240"},{"key":"10.1016\/j.compind.2016.08.004_bib0245","doi-asserted-by":"crossref","first-page":"213","DOI":"10.1061\/9780784412343.0027","article-title":"Formal specification of the IFC concept structure for precast model exchanges","volume":"2012","author":"Venugopal","year":"2012","journal-title":"Comput. Civ. Eng."},{"key":"10.1016\/j.compind.2016.08.004_bib0250","doi-asserted-by":"crossref","first-page":"381","DOI":"10.1061\/9780784412343.0048","article-title":"A semiotic analysis of building information model systems","author":"Hartmann","year":"2012","journal-title":"Comput. Civ. Eng."},{"key":"10.1016\/j.compind.2016.08.004_bib0255","series-title":"Procs 31st Annu. ARCOM Conf.","first-page":"1","article-title":"Incorporation of expert reasoning into the bim-based cost estimating process","author":"Xu","year":"2015"},{"key":"10.1016\/j.compind.2016.08.004_bib0260","first-page":"1","article-title":"A Semiotic approach to organisational modelling using norm analysis","author":"Tan","year":"2004","journal-title":"6th Int Conf. Enterp. Inf."},{"key":"10.1016\/j.compind.2016.08.004_bib0265","unstructured":"ISO 16739, Industry Foundation Classes (IFC) for data sharing in the construction and facility management industries (2013)."},{"key":"10.1016\/j.compind.2016.08.004_bib0270","unstructured":"BuildingSMART, IFC4 \u2013 the new buildingSMART Standard, 2013 http:\/\/www.buildingsmart-tech.org\/specifications\/ifc-releases\/ifc4-release\/buildingSMART_IFC4_Whatisnew.pdf."},{"year":"2007","series-title":"RICS New Rules of Measurement ? Order of Cost Estimating and Elemental Cost Planning","author":"The Royal Institution of Chartered Surveyors","key":"10.1016\/j.compind.2016.08.004_bib0275"},{"key":"10.1016\/j.compind.2016.08.004_bib0280","first-page":"1216","article-title":"Testing semantic interoperability","author":"Ma","year":"2006","journal-title":"Proc. Jt. Int. Conf. Comput. Decis. Mak. Civ. Build. Eng."},{"key":"10.1016\/j.compind.2016.08.004_bib0285","series-title":"16th Int. Conf. Enterp. Inf. Syst., Institute for Systems and Technologies of Information, Control and Communication","first-page":"161","article-title":"Knowledge-based design cost estimation through extending industry foundation classes","author":"Xu","year":"2014"},{"key":"10.1016\/j.compind.2016.08.004_bib0290","unstructured":"buildingSMART International Limited Freeware \u2013 Ifc 2015 http:\/\/www.ifcwiki.org\/index.php\/Free_Software (2015) (accessed 03.27.15)."},{"key":"10.1016\/j.compind.2016.08.004_bib0295","unstructured":"R. Stamper, The semiotic framework for information systems research, in: H. Nissen (Ed.), Inf. Syst. Res. Contemp. Approaches Emergent Tradit. North Holland, Amsterdam (1991) 515\u2013528."},{"key":"10.1016\/j.compind.2016.08.004_bib0300","doi-asserted-by":"crossref","first-page":"144","DOI":"10.1139\/l93-015","article-title":"Factors influencing formwork productivity","volume":"20","author":"Smith","year":"1993","journal-title":"Can. J. Civ. Eng."},{"key":"10.1016\/j.compind.2016.08.004_bib0305","first-page":"211","article-title":"Neural network model for estimating construction productivity","author":"Portas","year":"1997","journal-title":"Constr. Eng. Manag."},{"issue":"5","key":"10.1016\/j.compind.2016.08.004_bib0310","doi-asserted-by":"crossref","first-page":"295","DOI":"10.1061\/(ASCE)0733-9364(1999)125:5(295)","article-title":"Construction baseline productivity: theory and practice","volume":"125","author":"Thomas","year":"1999","journal-title":"J. Constr. Eng. Manag."},{"key":"10.1016\/j.compind.2016.08.004_bib0315","unstructured":"RSMeans, Building construction cost data (2005) https:\/\/www.rsmeans.com\/."},{"key":"10.1016\/j.compind.2016.08.004_bib0320","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1061\/(ASCE)0733-9364(1985)111:2(129)","article-title":"Climatic effects on construction","volume":"111","author":"Koehn","year":"1985","journal-title":"J. Constr. Eng. Manag."},{"issue":"3","key":"10.1016\/j.compind.2016.08.004_bib0325","doi-asserted-by":"crossref","first-page":"280","DOI":"10.1061\/(ASCE)0733-9364(2003)129:3(280)","article-title":"Probabilistic model for cost contingency","volume":"129","author":"Touran","year":"2016","journal-title":"J. Constr. Eng. Manage."},{"key":"10.1016\/j.compind.2016.08.004_bib0330","doi-asserted-by":"crossref","first-page":"385","DOI":"10.1061\/(ASCE)0733-9364(1993)119:2(385)","article-title":"Computerized daily site reporting","volume":"119","author":"Russell","year":"1993","journal-title":"J. Constr. Eng. Manag."},{"key":"10.1016\/j.compind.2016.08.004_bib0335","series-title":"Proc., ASCE Constr. Res. Congr., ASCE","article-title":"Construction productivity improvement: a study of human, managerial and external factors","author":"Liberda","year":"2003"},{"key":"10.1016\/j.compind.2016.08.004_bib0340","series-title":"Proc., Constr. Res. Congr., ASCE","first-page":"662","article-title":"Situation based modeling for construction productivity","author":"Choy","year":"2005"},{"key":"10.1016\/j.compind.2016.08.004_bib0345","first-page":"15","article-title":"Knowledge discovery in residential construction project cost data","volume":"2","author":"Boussabaine","year":"1999","journal-title":"15th Annu ARCOM Conf."},{"year":"2003","series-title":"Geometry-based Modeling and Simulation of Construction Processes","author":"Akba\u015f","key":"10.1016\/j.compind.2016.08.004_bib0350"},{"key":"10.1016\/j.compind.2016.08.004_bib0355","series-title":"Feature-based Product Modeling for Building Construction","first-page":"1","author":"Staub-french","year":"1991"},{"key":"10.1016\/j.compind.2016.08.004_bib0360","doi-asserted-by":"crossref","first-page":"101","DOI":"10.1016\/S0950-7051(02)00077-1","article-title":"Modelling dynamic behaviour of business organisations\u2014extension of DEMO from a semiotic perspective","volume":"16","author":"Liu","year":"2003","journal-title":"Knowl.-Based Syst."},{"key":"10.1016\/j.compind.2016.08.004_bib0365","series-title":"Deontic Logic in Computer Science","first-page":"17","article-title":"Applications of deontic logic in computer science: a concise overview","author":"Wieringa","year":"1994"},{"key":"10.1016\/j.compind.2016.08.004_bib0370","series-title":"Proc. Inf. Knowl. Manag. Complex Syst. (ICISO 2015)","first-page":"80","article-title":"Applying organizational semiotics for developing knowledge-based cost estimation of construction project","author":"Xu","year":"2015"},{"key":"10.1016\/j.compind.2016.08.004_bib0375","first-page":"1","article-title":"Translating OWL and Semantic Web Rules into Prolog: Moving Toward Description Logic Programs","author":"Samuel","year":"2008","journal-title":"Theory Pract. Logic Program."},{"key":"10.1016\/j.compind.2016.08.004_bib0380","unstructured":"J. Wielemaker, SWI-Prolog 6.6.6-Reference Manual (2014). http:\/\/www.swi-prolog.org\/download\/stable\/doc\/SWI-Prolog-6.6.6.pdf (accessed 08.08.16)."},{"key":"10.1016\/j.compind.2016.08.004_bib0385","series-title":"2010 Proc. of Australasian Transport Research Forum 33rd","article-title":"\u2018Best practice\u2019 Cost Estimation in Land Transport Infrastructure Projects","author":"Tan","year":"2010"},{"year":"2008","series-title":"Best Practice Cost Estimation for Publicly Funded Road and Rail Construction","author":"Evans&Peck","key":"10.1016\/j.compind.2016.08.004_bib0390"},{"key":"10.1016\/j.compind.2016.08.004_bib0395","unstructured":"V.O. Schinnerer, Construction Cost Estimating (2007). http:\/\/www.aia.org\/aiaucmp\/groups\/secure\/documents\/pdf\/aiap016637.pdf."},{"key":"10.1016\/j.compind.2016.08.004_bib0400","unstructured":"R. Shearer, B. Motik, I. Horrocks, HermiT: A Highly-Efficient OWL Reasoner, Complexity. 432 (2008) 10. http:\/\/ceur-ws.org\/Vol-432\/owled2008eu_submission_12pdf."},{"key":"10.1016\/j.compind.2016.08.004_bib0405","unstructured":"S. Bechhofer, OWL: FaCT ++ Dep. Comput. Sci. Kilburn Build. Univ. Manchester. http:\/\/owl.man.ac.uk\/factplusplus\/ (2004) (accessed 07.01.15)."},{"key":"10.1016\/j.compind.2016.08.004_bib0410","doi-asserted-by":"crossref","first-page":"51","DOI":"10.1016\/j.websem.2007.03.004","article-title":"Pellet: A practical OWL-DL reasoner","volume":"5","author":"Sirin","year":"2007","journal-title":"Web Semant. Sci. Serv. Agents World Wide Web"},{"key":"10.1016\/j.compind.2016.08.004_bib0415","unstructured":"P. Pauwels, J. Oraskari, IFC-to-RDF-converter (2015). https:\/\/github.com\/mmlab\/IFC-to-RDF-converter."},{"key":"10.1016\/j.compind.2016.08.004_bib0420","doi-asserted-by":"crossref","first-page":"11","DOI":"10.1016\/j.autcon.2007.02.013","article-title":"Reasoning about component similarity in building product models from the construction perspective","volume":"17","author":"Staub","year":"2007","journal-title":"Autom. Constr."},{"key":"10.1016\/j.compind.2016.08.004_bib0425","doi-asserted-by":"crossref","first-page":"934","DOI":"10.1016\/j.eswa.2013.06.061","article-title":"Intelligent systems research in the construction industry","volume":"41","author":"Irani","year":"2014","journal-title":"Expert Syst. Appl."},{"key":"10.1016\/j.compind.2016.08.004_bib0430","doi-asserted-by":"crossref","first-page":"196","DOI":"10.1016\/j.autcon.2010.09.017","article-title":"Application and extension of the IFC standard in construction cost estimating for tendering in China","volume":"20","author":"Ma","year":"2011","journal-title":"Autom. Constr."},{"key":"10.1016\/j.compind.2016.08.004_bib0435","unstructured":"B. Parsia, E. Sirin, B. Cuenca, E. Ruckhaus, D. Hewlett, Cautiously Approaching SWRL (2005). http:\/\/citeseerx.ist.psu.edu\/viewdoc\/summary?doi=10.1.1.222.7885."},{"key":"10.1016\/j.compind.2016.08.004_bib0440","unstructured":"T.R.I. of C. Surveyors, The Royal Institution of Chartered Surveyors, RICS New Rules of Measurement \u2013 Order of Cost Estimating and Elemental Cost Planning, Coventry, 2007."},{"key":"10.1016\/j.compind.2016.08.004_bib0445","unstructured":"T. Segaran, C. Evans, J. Taylor, Programming the semantic web, http:\/\/books.google.com\/books?hl=en&lr=&id=XShw5YSHoRUC&oi=fnd&pg=PR5&dq=Programming+the+Semantic+Web&ots=DxVnXYcJL2&sig=qwUXB191zfC4c8bdgTSbspDe1F8 (2009) (accessed 11.04.14)."}],"container-title":["Computers in Industry"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0166361516301580?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0166361516301580?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2019,9,14]],"date-time":"2019-09-14T00:45:23Z","timestamp":1568421923000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0166361516301580"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2016,12]]},"references-count":89,"alternative-id":["S0166361516301580"],"URL":"https:\/\/doi.org\/10.1016\/j.compind.2016.08.004","relation":{},"ISSN":["0166-3615"],"issn-type":[{"type":"print","value":"0166-3615"}],"subject":[],"published":{"date-parts":[[2016,12]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"A framework for integrating syntax, semantics and pragmatics for computer-aided professional practice: With application of costing in construction industry","name":"articletitle","label":"Article Title"},{"value":"Computers in Industry","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.compind.2016.08.004","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"\u00a9 2016 Elsevier B.V. All rights reserved.","name":"copyright","label":"Copyright"}]}}