{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,12,2]],"date-time":"2025-12-02T15:23:07Z","timestamp":1764688987659,"version":"3.40.5"},"reference-count":47,"publisher":"Elsevier BV","license":[{"start":{"date-parts":[[2015,1,1]],"date-time":"2015-01-01T00:00:00Z","timestamp":1420070400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"funder":[{"DOI":"10.13039\/100004341","name":"The Dow Chemical Company","doi-asserted-by":"crossref","id":[{"id":"10.13039\/100004341","id-type":"DOI","asserted-by":"crossref"}]}],"content-domain":{"domain":["elsevier.com","sciencedirect.com"],"crossmark-restriction":true},"short-container-title":["Computers &amp; Chemical Engineering"],"published-print":{"date-parts":[[2015,1]]},"DOI":"10.1016\/j.compchemeng.2014.08.003","type":"journal-article","created":{"date-parts":[[2014,8,12]],"date-time":"2014-08-12T16:16:54Z","timestamp":1407860214000},"page":"145-158","update-policy":"https:\/\/doi.org\/10.1016\/elsevier_cm_policy","source":"Crossref","is-referenced-by-count":22,"special_numbering":"C","title":["Long-term turnaround planning for integrated chemical sites"],"prefix":"10.1016","volume":"72","author":[{"given":"Satyajith","family":"Amaran","sequence":"first","affiliation":[]},{"given":"Nikolaos V.","family":"Sahinidis","sequence":"additional","affiliation":[]},{"given":"Bikram","family":"Sharda","sequence":"additional","affiliation":[]},{"given":"Matt","family":"Morrison","sequence":"additional","affiliation":[]},{"ORCID":"https:\/\/orcid.org\/0000-0003-4852-2169","authenticated-orcid":false,"given":"Scott J.","family":"Bury","sequence":"additional","affiliation":[]},{"given":"Scott","family":"Miller","sequence":"additional","affiliation":[]},{"given":"John M.","family":"Wassick","sequence":"additional","affiliation":[]}],"member":"78","reference":[{"unstructured":"American National Standards Institute definition of preventive maintenance. http:\/\/webstore.ansi.org\/preventive-maintenance\/ [accessed 21.02.14].","key":"10.1016\/j.compchemeng.2014.08.003_bib0005"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0010","doi-asserted-by":"crossref","first-page":"19","DOI":"10.1111\/j.1540-5915.1977.tb01065.x","article-title":"An experimental study of the effectiveness of rolling schedules in production planning","volume":"8","author":"Baker","year":"1977","journal-title":"Decis Sci"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0015","doi-asserted-by":"crossref","DOI":"10.1002\/aic.14412","article-title":"Optimal maintenance scheduling of a gas engine power plant using generalized disjunctive programming","author":"Castro","year":"2014","journal-title":"AIChE J"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0020","series-title":"PRES 2001, 4th conference on process integration, modelling, and optimisation for energy saving and pollution reduction","first-page":"355","article-title":"Total-site maintenance scheduling","author":"Cheung","year":"2001"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0025","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1016\/S0098-1354(03)00177-7","article-title":"Short-term site-wide maintenance scheduling","volume":"28","author":"Cheung","year":"2004","journal-title":"Comput Chem Eng"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0030","doi-asserted-by":"crossref","first-page":"1041","DOI":"10.1057\/jors.1983.235","article-title":"An operational approach to breakdown maintenance: problem recognition","volume":"34","author":"Christer","year":"1983","journal-title":"J Oper Res Soc"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0035","doi-asserted-by":"crossref","first-page":"387","DOI":"10.1287\/opre.51.3.387.14759","article-title":"Improving crew scheduling by incorporating key maintenance routing decisions","volume":"51","author":"Cohn","year":"2003","journal-title":"Oper Res"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0040","doi-asserted-by":"crossref","first-page":"192","DOI":"10.1021\/ie00040a019","article-title":"Optimal short-term scheduling of maintenance and production for multipurpose plants","volume":"34","author":"Dedopoulos","year":"1995","journal-title":"Ind Eng Chem Res"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0045","doi-asserted-by":"crossref","first-page":"S693","DOI":"10.1016\/0098-1354(95)00141-N","article-title":"Preventive maintenance policy optimisation for multipurpose plant equipment","volume":"19","author":"Dedopoulos","year":"1995","journal-title":"Comput Chem Eng"},{"year":"2002","author":"Dhillon","series-title":"Engineering maintenance: a modern approach","key":"10.1016\/j.compchemeng.2014.08.003_bib0050"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0055","doi-asserted-by":"crossref","first-page":"307","DOI":"10.1007\/BF02592064","article-title":"An outer-approximation algorithm for a class of mixed-integer nonlinear programs","volume":"36","author":"Duran","year":"1986","journal-title":"Math Program"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0060","doi-asserted-by":"crossref","first-page":"1415","DOI":"10.1287\/mnsc.35.12.1415","article-title":"Flight scheduling and maintenance base planning","volume":"35","author":"Feo","year":"1989","journal-title":"Manag Sci"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0065","doi-asserted-by":"crossref","first-page":"693","DOI":"10.1016\/j.cie.2004.12.007","article-title":"Maintenance scheduling and production control of multiple-machine manufacturing systems","volume":"48","author":"Gharbi","year":"2005","journal-title":"Comput Ind Eng"},{"unstructured":"Global Ethylene Database. http:\/\/www.industrialinfo.com\/database\/niche_markets\/ethylene_database.jsp [accessed 21.02.14].","key":"10.1016\/j.compchemeng.2014.08.003_bib0070"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0075","series-title":"Foundations of computer aided process operations","article-title":"Managing reliability and maintenance in the process industry","author":"Grievink","year":"1993"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0080","doi-asserted-by":"crossref","first-page":"99","DOI":"10.1002\/aic.11662","article-title":"Optimal design and planning of sustainable chemical supply chains under uncertainty","volume":"55","author":"Guill\u00e9n-Gos\u00e1lbez","year":"2009","journal-title":"AIChE J"},{"unstructured":"Industrial Info Resources. www.industrialinfo.com [accessed 21.02.14].","key":"10.1016\/j.compchemeng.2014.08.003_bib0085"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0090","doi-asserted-by":"crossref","first-page":"1623","DOI":"10.1002\/aic.690440714","article-title":"Cyclic scheduling of continuous parallel-process units with decaying performance","volume":"44","author":"Jain","year":"1998","journal-title":"AIChE J"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0095","doi-asserted-by":"crossref","first-page":"2087","DOI":"10.1016\/j.compchemeng.2004.06.006","article-title":"A simulation based optimization approach to supply chain management under demand uncertainty","volume":"28","author":"Jung","year":"2004","journal-title":"Comput Chem Eng"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0100","doi-asserted-by":"crossref","first-page":"145","DOI":"10.1016\/j.compchemeng.2007.03.007","article-title":"Global optimization of multiscenario mixed integer nonlinear programming models arising in the synthesis of integrated water networks under uncertainty","volume":"32","author":"Karuppiah","year":"2008","journal-title":"Comput Chem Eng"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0105","doi-asserted-by":"crossref","first-page":"1499","DOI":"10.1016\/j.compchemeng.2009.03.003","article-title":"Opportunistic policy for optimal preventive maintenance of a multi-component system in continuous operating units","volume":"33","author":"Laggoune","year":"2009","journal-title":"Comput Chem Eng"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0110","doi-asserted-by":"crossref","first-page":"2125","DOI":"10.1016\/S0098-1354(00)00581-0","article-title":"New algorithms for nonlinear generalized disjunctive programming","volume":"24","author":"Lee","year":"2000","journal-title":"Comput Chem Eng"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0115","doi-asserted-by":"crossref","first-page":"3056","DOI":"10.1021\/ie020923y","article-title":"New general continuous-time state-task network formulation for short-term scheduling of multipurpose batch plants","volume":"42","author":"Maravelias","year":"2003","journal-title":"Ind Eng Chem Res"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0120","doi-asserted-by":"crossref","first-page":"189","DOI":"10.1287\/ijoc.1100.0393","article-title":"Decision support and optimization in shutdown and turnaround scheduling","volume":"23","author":"Megow","year":"2011","journal-title":"INFORMS J Comput"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0125","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1016\/S0969-6997(00)00011-9","article-title":"A dynamic approach for aircraft assignment and maintenance scheduling by airlines","volume":"6","author":"Moudani","year":"2000","journal-title":"J Air Transp Manag"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0130","doi-asserted-by":"crossref","first-page":"476","DOI":"10.1109\/59.76689","article-title":"Power plant maintenance scheduling: optimizing economics and reliability","volume":"6","author":"Mukerji","year":"1991","journal-title":"IEEE Trans Power Syst"},{"unstructured":"North American Chemical Processing Industry Maintenance Turnarounds; 2008. http:\/\/www.industrialinfo.com\/media\/downloadMedia.jsp?mediaId=344733 [accessed 21.02.14].","key":"10.1016\/j.compchemeng.2014.08.003_bib0135"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0140","doi-asserted-by":"crossref","first-page":"707","DOI":"10.1016\/0098-1354(83)85023-6","article-title":"A structural optimization approach in process synthesis. II: heat recovery networks","volume":"7","author":"Papoulias","year":"1983","journal-title":"Comput Chem Eng"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0145","doi-asserted-by":"crossref","first-page":"1201","DOI":"10.1016\/S0098-1354(03)00047-4","article-title":"A model predictive control strategy for supply chain optimization","volume":"27","author":"Perea-Lopez","year":"2003","journal-title":"Comput Chem Eng"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0150","doi-asserted-by":"crossref","first-page":"3037","DOI":"10.1021\/ie00048a015","article-title":"A continuous time mixed integer linear programming model for short term scheduling of multistage batch plants","volume":"34","author":"Pinto","year":"1995","journal-title":"Ind Eng Chem Res"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0155","doi-asserted-by":"crossref","first-page":"433","DOI":"10.1023\/A:1018929829086","article-title":"Assignment and sequencing models for the scheduling of process systems","volume":"81","author":"Pinto","year":"1998","journal-title":"Ann Oper Res"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0160","doi-asserted-by":"crossref","first-page":"3195","DOI":"10.1021\/ie000431q","article-title":"Interactions of maintenance and production planning for multipurpose process plants \u2013 a system effectiveness approach","volume":"40","author":"Pistikopoulos","year":"2001","journal-title":"Ind Eng Chem Res"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0165","doi-asserted-by":"crossref","first-page":"563","DOI":"10.1016\/0098-1354(93)E0010-7","article-title":"Modelling and computational techniques for logic based integer programming","volume":"18","author":"Raman","year":"1994","journal-title":"Comput Chem Eng"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0170","doi-asserted-by":"crossref","first-page":"85","DOI":"10.1016\/0098-1354(91)87008-W","article-title":"MINLP model for cyclic multiproduct scheduling on continuous parallel lines","volume":"15","author":"Sahinidis","year":"1991","journal-title":"Comput Chem Eng"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0175","doi-asserted-by":"crossref","first-page":"1049","DOI":"10.1016\/0098-1354(89)87046-2","article-title":"Optimization model for long range planning in the chemical industry","volume":"13","author":"Sahinidis","year":"1989","journal-title":"Comput Chem Eng"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0180","doi-asserted-by":"crossref","first-page":"1157","DOI":"10.1016\/S0098-1354(96)00327-4","article-title":"Batch production and preventive maintenance scheduling under equipment failure uncertainty","volume":"21","author":"Sanmart\u00ed","year":"1997","journal-title":"Comput Chem Eng"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0185","doi-asserted-by":"crossref","first-page":"850","DOI":"10.1109\/59.76735","article-title":"Maintenance scheduling by using simulated annealing method [for power plants]","volume":"6","author":"Satoh","year":"1991","journal-title":"IEEE Trans Power Plants"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0190","doi-asserted-by":"crossref","first-page":"379","DOI":"10.1111\/j.1937-5956.2000.tb00465.x","article-title":"Combined production and maintenance scheduling for a multiple-product, single-machine production system","volume":"9","author":"Sloan","year":"2000","journal-title":"Prod Oper Manag"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0195","first-page":"29","article-title":"An optimization model for aircraft maintenance scheduling and re-assignment","volume":"37","author":"Sriram","year":"2003","journal-title":"Transp Res Part A: Policy Pract"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0200","doi-asserted-by":"crossref","first-page":"318","DOI":"10.1287\/mnsc.46.2.318.11924","article-title":"Improved rolling horizon schedules for the dynamic single-level lot-sizing problem","volume":"46","author":"Stadtler","year":"2000","journal-title":"Manag Sci"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0205","doi-asserted-by":"crossref","first-page":"1451","DOI":"10.1016\/S0098-1354(97)88493-1","article-title":"A general framework for preventive maintenance optimization in chemical process operations","volume":"21","author":"Tan","year":"1997","journal-title":"Comput Chem Eng"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0210","doi-asserted-by":"crossref","first-page":"769","DOI":"10.1016\/0098-1354(90)87085-4","article-title":"A combined penalty function and outer-approximation method for MINLP optimization","volume":"14","author":"Viswanathan","year":"1990","journal-title":"Comput Chem Eng"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0215","doi-asserted-by":"crossref","first-page":"779","DOI":"10.1016\/j.ress.2007.03.027","article-title":"Genetic algorithm optimisation of the maintenance scheduling of generating units in a power system","volume":"93","author":"Volkanovski","year":"2008","journal-title":"Reliab Eng Syst Saf"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0220","doi-asserted-by":"crossref","first-page":"2770","DOI":"10.1109\/TPAS.1982.317516","article-title":"Maintenance scheduling: description, literature survey, and interface with overall operations scheduling","volume":"PAS-101","author":"Yamayee","year":"1982","journal-title":"IEEE Trans Power Appar Syst"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0225","doi-asserted-by":"crossref","first-page":"87","DOI":"10.1007\/s10845-007-0047-3","article-title":"Maintenance scheduling in manufacturing systems based on predicted machine degradation","volume":"19","author":"Yang","year":"2008","journal-title":"J Intell Manuf"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0230","doi-asserted-by":"crossref","first-page":"345","DOI":"10.1109\/TSM.2004.831948","article-title":"Optimal preventive maintenance scheduling in semiconductor manufacturing","volume":"17","author":"Yao","year":"2004","journal-title":"IEEE Trans Semicond Manuf"},{"key":"10.1016\/j.compchemeng.2014.08.003_bib0235","doi-asserted-by":"crossref","first-page":"1151","DOI":"10.1016\/0098-1354(90)85009-Y","article-title":"Simultaneous optimization models for heat integration. I: area and energy targeting and modeling of multi-stream exchangers","volume":"14","author":"Yee","year":"1990","journal-title":"Comput Chem Eng"}],"container-title":["Computers &amp; Chemical Engineering"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0098135414002452?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0098135414002452?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"}],"deposited":{"date-parts":[[2020,5,12]],"date-time":"2020-05-12T04:20:25Z","timestamp":1589257225000},"score":1,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0098135414002452"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,1]]},"references-count":47,"alternative-id":["S0098135414002452"],"URL":"https:\/\/doi.org\/10.1016\/j.compchemeng.2014.08.003","relation":{},"ISSN":["0098-1354"],"issn-type":[{"type":"print","value":"0098-1354"}],"subject":[],"published":{"date-parts":[[2015,1]]},"assertion":[{"value":"Elsevier","name":"publisher","label":"This article is maintained by"},{"value":"Long-term turnaround planning for integrated chemical sites","name":"articletitle","label":"Article Title"},{"value":"Computers & Chemical Engineering","name":"journaltitle","label":"Journal Title"},{"value":"https:\/\/doi.org\/10.1016\/j.compchemeng.2014.08.003","name":"articlelink","label":"CrossRef DOI link to publisher maintained version"},{"value":"article","name":"content_type","label":"Content Type"},{"value":"Copyright \u00a9 2014 Elsevier Ltd. All rights reserved.","name":"copyright","label":"Copyright"}]}}