{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T19:56:08Z","timestamp":1725566168453},"publisher-location":"Berlin, Heidelberg","reference-count":5,"publisher":"Springer Berlin Heidelberg","isbn-type":[{"type":"print","value":"9783540253303"},{"type":"electronic","value":"9783540317951"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2005]]},"DOI":"10.1007\/11407522_2","type":"book-chapter","created":{"date-parts":[[2010,9,23]],"date-time":"2010-09-23T20:24:37Z","timestamp":1285273477000},"page":"17-46","source":"Crossref","is-referenced-by-count":4,"title":["Scheduling on the Top 50 Machines"],"prefix":"10.1007","author":[{"given":"Carsten","family":"Ernemann","sequence":"first","affiliation":[]},{"given":"Martin","family":"Krogmann","sequence":"additional","affiliation":[]},{"given":"Joachim","family":"Lepping","sequence":"additional","affiliation":[]},{"given":"Ramin","family":"Yahyapour","sequence":"additional","affiliation":[]}],"member":"297","reference":[{"key":"2_CR1","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1007\/3-540-63574-2","volume-title":"Job Scheduling Strategies for Parallel Processing","author":"D.G. Feitelson","year":"1997","unstructured":"Feitelson, D.G., Rudolph, L., Schwiegelshohn, U., Sevcik, K.C., Wong, P.: Theory and practice in parallel job scheduling. In: Feitelson, D.G., Rudolph, L. (eds.) IPPS-WS 1997 and JSSPP 1997. LNCS, vol.\u00a01291, pp. 1\u201334. Springer, Heidelberg (1997)"},{"key":"2_CR2","unstructured":"22nd TOP500 List introduced during the Supercomputer Conference (SC2003) in Phoenix, AZ (November 2003), \n                  \n                    http:\/\/www.top500.org"},{"key":"2_CR3","first-page":"542","volume-title":"Proceedings of IPPS\/SPDP 1998","author":"D.G. Feitelson","year":"1998","unstructured":"Feitelson, D.G., Weil, A.M.: Utilization and Predictabillity in Scheduling the IBM SP2 with Backfilling. In: Proceedings of IPPS\/SPDP 1998, pp. 542\u2013546. IEEE Computer Society, Los Alamitos (1998)"},{"key":"2_CR4","series-title":"Lecture Notes in Computer Science","doi-asserted-by":"crossref","first-page":"295","DOI":"10.1007\/3-540-60153-8_35","volume-title":"Job Scheduling Strategies for Parallel Processing","author":"D.A. Lifka","year":"1995","unstructured":"Lifka, D.A.: The ANL\/IBM SP Scheduling System. In: Feitelson, D.G., Rudolph, L. (eds.) IPPS-WS 1995 and JSSPP 1995. LNCS, vol.\u00a0949, pp. 295\u2013303. Springer, Heidelberg (1995)"},{"key":"2_CR5","unstructured":"Petitet, A., Whaley, R.C., Dongarra, J., Cleary, A.: HPL - A Portable Implementation of the High-Performance Linpack Benchmark for Distributed-Memory Computers, \n                  \n                    http:\/\/www.netlib.org\/benchmark"}],"container-title":["Lecture Notes in Computer Science","Job Scheduling Strategies for Parallel Processing"],"original-title":[],"link":[{"URL":"http:\/\/link.springer.com\/content\/pdf\/10.1007\/11407522_2.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2021,4,27]],"date-time":"2021-04-27T07:02:54Z","timestamp":1619506974000},"score":1,"resource":{"primary":{"URL":"http:\/\/link.springer.com\/10.1007\/11407522_2"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2005]]},"ISBN":["9783540253303","9783540317951"],"references-count":5,"URL":"https:\/\/doi.org\/10.1007\/11407522_2","relation":{},"ISSN":["0302-9743","1611-3349"],"issn-type":[{"type":"print","value":"0302-9743"},{"type":"electronic","value":"1611-3349"}],"subject":[],"published":{"date-parts":[[2005]]}}}